PadstakeGet the fee reports
Menu

Prosper, TX

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Town of Prosper Ordinance 2025-42 (adopted Aug 26 2025; ecode360 PR6834 LF2464357, src 1826, read 2026-11-13): roadway impact fee for single-family detached $7,597 per dwelling unit in Service Area 1 (west of BNSF RR) and $7,879 in Service Area 2 (east); water $5,969 and wastewater $8,421 for a 1-inch displacement meter; all set at 50% of the maximum. Not included: building permit fees (ordinance 2025-47), water and sewer tap and meter fees, other town fees, school and county charges.

Water/sewer provider: Town of Prosper (roadway, water, wastewater impact fees)

LinePrinted ratePrototypeReceipt
Roadway impact fee, single-family detached (ITE 210), per dwelling unit, Service Area 2 (east of BNSF RR)
transportation
$7,879 /dwelling unit
per dwelling unit
$7,879Printed in Exhibit A (50% of maximum); Service Area 1 (west of BNSF RR) is $7,597; headline uses the higher area
Effective 2025-08-26
Source · p.8 (Exhibit A)
fetched 2026-11-13, sha256 d85ca1df0f4d
Water impact fee, 1-inch displacement meter (standard single-family service unit)
water
$5,969
per meter, by meter size
$5,969Printed in Exhibit B (50% of maximum)
Effective 2025-08-26
Source · p.10 (Exhibit B)
fetched 2026-11-13, sha256 d85ca1df0f4d
Wastewater impact fee, 1-inch displacement meter (standard single-family service unit)
sewer
$8,421
per meter, by meter size
$8,421Printed in Exhibit C (50% of maximum)
Effective 2025-08-26
Source · p.10 (Exhibit C)
fetched 2026-11-13, sha256 d85ca1df0f4d

Fee-change calendar

Neighbouring cities in Dallas-Fort Worth

All published Dallas-Fort Worth fees

Tell me when Prosper is complete

Leave a work email. Your signup is stored now; nothing is emailed.