Aubrey, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. From the City of Aubrey Code Appendix A Fee Schedule, Art A7.000 Utilities, on eCode360 (owner-approved host, read politely 2026-11-12): water impact fee $5,820.00 and wastewater impact fee $10,586.00 per LUE for a single-family meter of 1 inch or less. The schedule titles the list "allowable maximum fee" and labels the per-LUE amounts "50% max"; the table is the only amount posted, so it is shown as the printed fee. Not included: building permit and plan review, roadway impact fee, water/sewer tap and meter set (meter box $115, endpoint $155, connection $20 posted but not summed), deposits.
Water/sewer provider: City of Aubrey (water, wastewater impact fees)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, single-family residential, meter 1 inch or less (50% of maximum) water | $5,820.00 per living unit equivalent (LUE) | $5,820 | Printed (Art A7.000(j)(1)(A)) Effective 2026-11-12 Source · Aubrey Code Apx A Fee Schedule, Art A7.000 Utilities (ecode360; read 2026-11-12), (j) fetched 2026-11-12, sha256 7613dd6ce892 |
| Wastewater impact fee, single-family residential, meter 1 inch or less (50% of maximum) sewer | $10,586.00 per LUE | $10,586 | Printed (Art A7.000(j)(1)(B)) Effective 2026-11-12 Source · Aubrey Code Apx A Fee Schedule, Art A7.000 Utilities (ecode360; read 2026-11-12), (j) fetched 2026-11-12, sha256 7613dd6ce892 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Neighbouring cities in Dallas-Fort Worth
- Northlake, TX
- Sanger, TX
- Anna, TX
- Balch Springs, TX
- Cedar Hill, TX
- Farmersville, TX
- Forney, TX
- Fort Worth, TX
All published Dallas-Fort Worth fees
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.