Farmersville, TX
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: boring fee ($1,000 if the sewer tap needs a street bore), driveway approach ($100), irrigation system ($150), utility service connect fee and deposits, extraordinary tap costs the city itemizes, school and other district fees. Building square footage assumed 2,400 (heated plus garage). Impact fees apply to developments platted on or after Feb 3 2025 (Ord. O-2025-0203-000). Master Fee Schedule Ord. O-2026-0921-002 (Sept 21 2026) is an image-only PDF: amounts were read visually from the rendered pages and transcribed into the stored source text.
Water/sewer provider: City of Farmersville
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 3/4-inch meter (1.00 service unit) water | $2,000 per service unit, by meter size | $2,000 | Printed (developments platted on or after Feb 3, 2025) Effective 2025-02-03 Source · p.10 Sec. 8 Impact Fees fetched 2026-11-07, sha256 3970b53c4f14 |
| Wastewater impact fee, 3/4-inch meter (1.00 service unit) sewer | $3,000 per service unit, by meter size | $3,000 | Printed Effective 2025-02-03 Source · p.10 Sec. 8 Impact Fees fetched 2026-11-07, sha256 3970b53c4f14 |
| Roadway impact fee, single-family, 3/4-inch meter transportation | $1,000 per dwelling, by meter size | $1,000 | Printed Effective 2025-02-03 Source · p.10 Sec. 8 Impact Fees fetched 2026-11-07, sha256 3970b53c4f14 |
| Park development fee, single-family, new development parks | $2000 per new single-family lot | $2,000 | Printed Effective 2026-09-21 Source · p.13 Sec. 9 Other Building Permit Fees fetched 2026-11-07, sha256 3970b53c4f14 |
| Residential building permit, new one- and two-family dwelling (MEP included) permit · computed | $1.00 per square foot per square foot under roof | $2,400 | 2,400 sq ft (heated plus garage, entire area under roof) x 1.00 = 2,400.00 Effective 2026-09-21 Source · p.10-11 Sec. 9 Residential Building Permits fetched 2026-11-07, sha256 3970b53c4f14 |
| Residential plan review, per building permit | $225 per building | $225 | Printed Effective 2026-09-21 Source · p.10 Sec. 9 Residential Building Permits fetched 2026-11-07, sha256 3970b53c4f14 |
| Water tap, 3/4-inch water | $2,000 per tap, by size | $2,000 | Printed Effective 2026-09-21 Source · p.8 Sec. 5 Water and Sewer Tap Fees fetched 2026-11-07, sha256 3970b53c4f14 |
| Sewer tap, 4-inch (smallest printed) sewer | $2,000 per tap | $2,000 | Printed Effective 2026-09-21 Source · p.8 Sec. 5 Water and Sewer Tap Fees fetched 2026-11-07, sha256 3970b53c4f14 |
| Total listed | $14,625 |
Fee-change calendar
- None recorded
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.