Firestone town, CO
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified, with water tap and building permit lines. Included: Firestone water tap (5/8-inch SVW), meter, town impact fees (transportation, drainage, parks, municipal facilities, raw water irrigation; printed total $17,743.34), building permit and 65% plan review on computed $380,268 valuation, electrical permit, administration fee and use tax. Missing: sewer tap (St. Vrain Sanitation District, no amount posted), Central Weld County Water District fees (sheet says email [email protected]), Frederick-Firestone Fire Protection District impact fee, St. Vrain Valley school fee, plumbing and mechanical permits. The building fee schedule is rev 01.2025 (the sheet refers to the 2025 schedule). Searched 2026-11-09.
Water/sewer provider: Town of Firestone (water; St. Vrain Sanitation sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap size 5/8-inch SVW water | $25,004.00 per tap | $25,004 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Fees Charged By the Town fetched 2026-11-08, sha256 55b072f5304d |
| Water meter only tap | $713.77 each | $713.77 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Meter Only fetched 2026-11-08, sha256 55b072f5304d |
| Impact fee, transportation transport | $5,810.62 per single family residence | $5,810.62 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees fetched 2026-11-08, sha256 55b072f5304d |
| Impact fee, drainage stormwater | $1,715.07 per single family residence | $1,715.07 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees fetched 2026-11-08, sha256 55b072f5304d |
| Impact fee, parks parks | $6,818.70 per single family residence | $6,818.70 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees fetched 2026-11-08, sha256 55b072f5304d |
| Impact fee, municipal facilities general | $925.27 per single family residence | $925.27 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees fetched 2026-11-08, sha256 55b072f5304d |
| Impact fee, raw water irrigation water | $2,473.68 per single family residence | $2,473.68 | Printed Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees fetched 2026-11-08, sha256 55b072f5304d |
| Building permit, $100,001-$500,000 tier, valuation $380,268 permit · computed | $1,075 for the first $100,000 plus $6.50 for each additional $1,000 or fraction valuation | $2,901.50 | $1,075 + 281 x $6.50 = $2,901.50 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) Effective 2026-01-01 Source · Town of Firestone Building Division Fee Schedule (REV 01.2025), Building Permit Fee Table fetched 2026-11-08, sha256 8c8dd154c1a7 |
| Plan review fee, 65% of building permit fee permit · computed | 65% of Building Permit Fee of permit fee | $1,885.98 | 0.65 x $2,901.50 = $1,885.98 Effective 2026-01-01 Source · Town of Firestone Building Division Fee Schedule (REV 01.2025) fetched 2026-11-08, sha256 8c8dd154c1a7 |
| Electrical permit, residential 1501-2000 sq ft permit | $282.40 per permit | $282.40 | Printed Effective 2026-01-01 Source · Town of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table fetched 2026-11-08, sha256 8c8dd154c1a7 |
| Administration fee, new single family detached permit | $ 125.00 per permit | $125 | Printed Effective 2026-01-01 Source · Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees fetched 2026-11-08, sha256 8c8dd154c1a7 |
| Use tax, 2.6% of half the valuation total tax · computed | 2.6% of Half the Valuation Total of half valuation | $4,943.48 | 0.026 x (380,268 / 2) = $4,943.48 Effective 2026-01-01 Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Use Tax fetched 2026-11-08, sha256 55b072f5304d |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Neighbouring cities in Denver
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.