Padstake
Menu

Firestone town, CO

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified, with water tap and building permit lines. Included: Firestone water tap (5/8-inch SVW), meter, town impact fees (transportation, drainage, parks, municipal facilities, raw water irrigation; printed total $17,743.34), building permit and 65% plan review on computed $380,268 valuation, electrical permit, administration fee and use tax. Missing: sewer tap (St. Vrain Sanitation District, no amount posted), Central Weld County Water District fees (sheet says email [email protected]), Frederick-Firestone Fire Protection District impact fee, St. Vrain Valley school fee, plumbing and mechanical permits. The building fee schedule is rev 01.2025 (the sheet refers to the 2025 schedule). Searched 2026-11-09.

Water/sewer provider: Town of Firestone (water; St. Vrain Sanitation sewer)

LinePrinted ratePrototypeReceipt
Water tap size 5/8-inch SVW
water
$25,004.00
per tap
$25,004Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Fees Charged By the Town
fetched 2026-11-08, sha256 55b072f5304d
Water meter only
tap
$713.77
each
$713.77Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Meter Only
fetched 2026-11-08, sha256 55b072f5304d
Impact fee, transportation
transport
$5,810.62
per single family residence
$5,810.62Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees
fetched 2026-11-08, sha256 55b072f5304d
Impact fee, drainage
stormwater
$1,715.07
per single family residence
$1,715.07Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees
fetched 2026-11-08, sha256 55b072f5304d
Impact fee, parks
parks
$6,818.70
per single family residence
$6,818.70Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees
fetched 2026-11-08, sha256 55b072f5304d
Impact fee, municipal facilities
general
$925.27
per single family residence
$925.27Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees
fetched 2026-11-08, sha256 55b072f5304d
Impact fee, raw water irrigation
water
$2,473.68
per single family residence
$2,473.68Printed
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Impact Fees
fetched 2026-11-08, sha256 55b072f5304d
Building permit, $100,001-$500,000 tier, valuation $380,268
permit · computed
$1,075 for the first $100,000 plus $6.50 for each additional $1,000 or fraction
valuation
$2,901.50$1,075 + 281 x $6.50 = $2,901.50 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400)
Effective 2026-01-01
Source · Town of Firestone Building Division Fee Schedule (REV 01.2025), Building Permit Fee Table
fetched 2026-11-08, sha256 8c8dd154c1a7
Plan review fee, 65% of building permit fee
permit · computed
65% of Building Permit Fee
of permit fee
$1,885.980.65 x $2,901.50 = $1,885.98
Effective 2026-01-01
Source · Town of Firestone Building Division Fee Schedule (REV 01.2025)
fetched 2026-11-08, sha256 8c8dd154c1a7
Electrical permit, residential 1501-2000 sq ft
permit
$282.40
per permit
$282.40Printed
Effective 2026-01-01
Source · Town of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table
fetched 2026-11-08, sha256 8c8dd154c1a7
Administration fee, new single family detached
permit
$ 125.00
per permit
$125Printed
Effective 2026-01-01
Source · Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees
fetched 2026-11-08, sha256 8c8dd154c1a7
Use tax, 2.6% of half the valuation total
tax · computed
2.6% of Half the Valuation Total
of half valuation
$4,943.480.026 x (380,268 / 2) = $4,943.48
Effective 2026-01-01
Source · Town of Firestone Single Family Residential fee sheet effective 1/1/2026, Use Tax
fetched 2026-11-08, sha256 55b072f5304d

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Neighbouring cities in Denver

All published Denver fees

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.