Longmont, CO
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: electric community investment fee and meter (Longmont Power & Communications, priced by panel size), electrical, plumbing and mechanical permits, water meter and tap installation, fire district and school fees, use tax. Inside-city water rate used (outside city is higher); lot size assumed 7,000 sq ft (water fee adds $0.58 per sq ft of gross lot size); 3/4-inch meter row (5/8-inch row is lower). The fees may be deferred under Municipal Code chapter 4.78. Building valuation uses ICC Building Valuation Data (R-3 and U, type V-B) as printed in another city's guide, labelled computed. Fee Manual dated March 24 2026.
Water/sewer provider: City of Longmont
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Transportation fee, residential, 1,601 to 2,400 sq ft housing unit transportation | $2,204.87 per housing unit, by size | $2,204.87 | Printed; 2,000 sq ft heated falls in this band Effective 2026-03-24 Source · Fee Manual 3-24-2026, Impact and Development Fees fetched 2026-11-08, sha256 6d0a59444f0a |
| Recreation buildings impact fee, 1,601 to 2,400 sq ft dwelling parks | $1,621.56 per dwelling, by size | $1,621.56 | Printed Effective 2026-03-24 Source · Fee Manual 3-24-2026, Impact and Development Fees (p.8) fetched 2026-11-08, sha256 6d0a59444f0a |
| Park improvement fee, single-family detached parks | $7,418.75 per unit | $7,418.75 | Printed Effective 2026-03-24 Source · Fee Manual 3-24-2026, Impact and Development Fees (p.8) fetched 2026-11-08, sha256 6d0a59444f0a |
| Storm drainage fee, residential single-family drainage | $1,693.53 per permit | $1,693.53 | Printed Effective 2026-03-24 Source · Fee Manual 3-24-2026, Impact and Development Fees (p.8) fetched 2026-11-08, sha256 6d0a59444f0a |
| Water system development fee, 3/4-inch meter, inside city water · computed | $7,001.60 + $0.58 per sq ft of gross lot size per meter plus per sq ft of lot | $11,061.60 | 7,001.60 + 0.58 x 7,000 sq ft lot (assumed) = 11,061.60 Effective 2026-03-24 Source · Water/Wastewater Development Fees (p.13) fetched 2026-11-08, sha256 6d0a59444f0a |
| Windy Gap surcharge, 3/4-inch meter water | $2,440 per meter | $2,440 | Printed Effective 2026-03-24 Source · Water/Wastewater Development Fees (p.13) fetched 2026-11-08, sha256 6d0a59444f0a |
| Wastewater system development fee, 3/4-inch meter sewer | $8,911.13 per meter | $8,911.13 | Printed Effective 2026-03-24 Source · Water/Wastewater Development Fees (p.13) fetched 2026-11-08, sha256 6d0a59444f0a |
| Building permit (primary fee schedule, valuation-based) permit · computed | $1,142.55 for the first $100,000, plus $6.44 for each additional $1,000 by valuation, $100,001 to $500,000 | $2,952.19 | Valuation = 2,000 sq ft x $175.92 (ICC BVD R-3 V-B) + 400 sq ft garage x $71.07 (U V-B) = $380,268.00; $1,142.55 + $6.44 x 281 (each $1,000 or fraction over $100,000) = $2,952.19. Values from the ICC table printed in Raleigh's FY27 guide (source 15) Effective 2026-03-24 Source · Building Permit Fees, Primary Fee Schedule (p.6) fetched 2026-11-08, sha256 6d0a59444f0a |
| Plan review fee, residential permit · computed | 50% of building permit fee percent of permit fee | $1,476.10 | 50% x $2,952.19 = $1,476.10 Effective 2026-03-24 Source · Plan Review Fees (p.6) fetched 2026-11-08, sha256 6d0a59444f0a |
| Total listed | $39,779.73 |
Fee-change calendar
- None recorded
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.