PadstakeFeesMoratoriaSite-work pricesMethodologyPricing

Aurora, CO

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$49,204listed total
Nonerank by 2025 new single-family permits

Not included: forestry fee ($8.65 per lineal foot of street frontage, depends on the lot), park development (cash in lieu if the city approves: about $2,397 per single-family unit by the Schedule 6 formula) and land dedication or cash in lieu of land (market-value based), sales and use tax deposit (3.75% of materials cost) and Arapahoe County open space use tax (0.25%), school district fees, trade permits and any metropolitan district charges. Lot size assumed 7,000 sq ft (lot-size-based fees use the same lot Denver Water uses in its published example); 2 bathrooms, 5/8-inch meter, standard outdoor rate (conservation-ordinance developments pay less); connections platted before Jan 1 2017/2019 may be credited. Building square footage assumed 2,400 (heated plus garage). All schedules effective 2026.

Water/sewer provider: Aurora Water; Metro Water Recovery

LinePrinted ratePrototypeReceipt
Capital impact fee, single-family detached
general
$9,327 per unit
per unit
$9,327Printed
Effective 2026-01-01
Source · Development Fees Checklist (2026), Building Permit, Capital Impact Fee
fetched 2026-11-08, sha256 e666398cffd2
Building permit and plan review, R-3 single-family home (includes plan review, inspections)
permit · computed
$1.30 per sq ft (min $2,000)
per square foot
$3,1202,400 sq ft (2,000 heated + 400 garage, assumed all counted) x 1.30 = 3,120.00; above the $2,000 minimum
Effective 2026-01-01
Source · Fee Schedule 3, Building Fee Table (R-3)
fetched 2026-11-08, sha256 28408e3ce361
Water service connection fee, indoor use (1-2 bathrooms)
water
$8,651
per unit, by bathroom count
$8,651Printed; prototype has 2 bathrooms
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
Water transmission development fee, indoor use (1-2 bathrooms)
water
$295
per unit, by bathroom count
$295Printed
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
Water service connection fee, outdoor use (standard rate)
water · computed
$2.087 per sq ft of lot size
per sq ft of lot
$14,6097,000 sq ft lot (assumed) x 2.087 = 14,609.00; developments under the conservation ordinance pay $1.478 per sq ft
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
Water transmission development fee, outdoor use (standard rate)
water · computed
$0.050 per sq ft of lot size
per sq ft of lot
$3507,000 sq ft lot (assumed) x 0.050 = 350.00; conservation rate $0.036
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
City of Aurora sanitary sewer connection fee
sewer
$5,875
per unit
$5,875Printed
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
City of Aurora sewer interceptor development fee
sewer
$536
per unit
$536Printed
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
Stormwater development fee
drainage · computed
$0.053 per sq ft of lot size
per sq ft of lot
$3717,000 sq ft lot (assumed) x 0.053 = 371.00
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
Metro Wastewater District sewer connection fee, 5/8-inch meter
sewer
$6,070
per meter, by size
$6,070Printed (collected by the City)
Effective 2026-01-01
Source · Fee Schedule 7, Single Family Residential Detached Connection Fees
fetched 2026-11-08, sha256 990116b8e69e
Total listed$49,204

Fee-change calendar

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.