Avondale, AZ
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Not included: library impact fee ($0.00 for a single unit), single-family house product plan review ($765.00, applies to a builder's standard plan) and residential standard-plan site plan review ($116.00), additional paving repair for a meter ($175.00), contractor-install meter option ($440.00), permit fees for other valuation tiers, sales/state surcharges. Source: FY 2026 Rates & Fees Schedule, 40 pages, every page marked Effective 5/9/2026; each line prints its own authority date. The city runs its own water and sewer utility. Building valuation uses ICC Building Valuation Data (R-3 and U, type V-B) as printed in another city's guide, labelled computed. A newer FY2027 schedule (reported effective 9/1/2026) was not found on the city site.
Water/sewer provider: City of Avondale
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Fire development impact fee, residential single unit fire | $2,184.00 per dwelling unit per dwelling unit | $2,184 | Printed (Municipal Code 26-10/26-4) Effective 2023-06-17 Source · p.2 Development Impact Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Parks development impact fee, residential single unit parks | $1,697.00 per dwelling unit per dwelling unit | $1,697 | Printed (Municipal Code 26-10/26-4) Effective 2023-06-17 Source · p.2 Development Impact Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Police development impact fee, residential single unit police | $2,089.00 per dwelling unit per dwelling unit | $2,089 | Printed (Municipal Code 26-10/26-4) Effective 2023-06-17 Source · p.3 Development Impact Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Streets (transportation) development impact fee, residential single unit streets | $1,790.00 per dwelling unit per dwelling unit | $1,790 | Printed (Municipal Code 26-10/26-4) Effective 2023-06-17 Source · p.3 Development Impact Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Water development impact fee, residential (0.75 inch meter) water | $3,519.00 per dwelling unit / per .75 inch meter per dwelling unit or .75-inch meter | $3,519 | Printed; same amount for a 0.75-inch meter Effective 2023-06-17 Source · p.3 Development Impact Fees - Water fetched 2026-11-11, sha256 8e11b99853e7 |
| Sewer development impact fee, residential (0.75 inch meter) sewer | $10,854.00 per dwelling unit / per .75 inch meter per dwelling unit or .75-inch meter | $10,854 | Printed; effective 5/9/2026 Effective 2026-05-09 Source · p.3 Development Impact Fees - Sewer fetched 2026-11-11, sha256 8e11b99853e7 |
| Sewer connection and installation fee, single family sewer | $300.00 each each | $300 | Printed (Municipal Code 24-89) Effective 2006-02-21 Source · p.37 Sewer Connection and Installation Fee fetched 2026-11-11, sha256 8e11b99853e7 |
| 3/4-inch water meter installation, city install, residential water | $450.00 each each | $450 | Printed (city install; contractor install is $440.00) Effective 2002-07-15 Source · p.38 Water Meter Installation fetched 2026-11-11, sha256 8e11b99853e7 |
| Building permit, Tier F (valuation $100,001 to $500,000) permit · computed | $1,247.00 for the first $100,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $500,000 by valuation | $3,495 | Valuation = 2,000 sq ft x $175.92 (ICC BVD R-3 V-B) + 400 sq ft garage x $71.07 (U V-B) = $380,268.00; $1,247 + $8 x 281 = $3,495.00. Valuation basis is the ICC table printed in Raleigh's FY27 guide; Avondale's own valuation table not posted. Effective 2012-07-18 Source · p.9 Building permit tiers fetched 2026-11-11, sha256 8e11b99853e7 |
| Building plan review fee permit · computed | 65% of Building Permit Fee percent of permit fee | $2,271.75 | 65% x $3,495.00 = $2,271.75 Effective 2012-07-18 Source · p.9 Building Plan Review Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Application processing fee permit | $102.00 per application/permit per permit | $102 | Printed Effective 2025-09-01 Source · p.8 Building Division Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Electrical permit permit | $112.00 flat flat | $112 | Printed Effective 2025-09-01 Source · p.10 Mechanical/Plumbing/Electrical fetched 2026-11-11, sha256 8e11b99853e7 |
| Mechanical permit permit | $90.00 flat flat | $90 | Printed Effective 2025-09-01 Source · p.10 Mechanical/Plumbing/Electrical fetched 2026-11-11, sha256 8e11b99853e7 |
| Plumbing permit permit | $96.00 flat flat | $96 | Printed Effective 2025-09-01 Source · p.10 Mechanical/Plumbing/Electrical fetched 2026-11-11, sha256 8e11b99853e7 |
| Certificate of occupancy permit | $158.00 each each | $158 | Printed Effective 2025-09-01 Source · p.9 Certificate of Occupancy Fees fetched 2026-11-11, sha256 8e11b99853e7 |
| Total listed | $29,207.75 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199