Glendale, AZ
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: electrical, mechanical and plumbing permits (priced per item), water and sewer taps and meter installation (no amounts found in a city document), engineering/civil plan review per sheet, solid waste, utility deposits, school and other district fees. Utility development fees use East Glendale (West Glendale is $0). Building valuation uses ICC Building Valuation Data (R-3 and U, type V-B) as printed in another city's guide, labelled computed; 2,000 sq ft heated plus 400 sq ft garage. Permit fee schedule is the Community Development Fee Schedule effective May 10 2019, the one the city links as current; impact fee schedule effective Sept 8 2025, revised 6/24/2026.
Water/sewer provider: City of Glendale
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Fire development impact fee, single family fire | $850 per housing unit per housing unit | $850 | Printed Effective 2025-09-08 Source · p.2 Development Impact Fee Schedule, Single Family (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Library development impact fee, single family library | $355 per housing unit per housing unit | $355 | Printed Effective 2025-09-08 Source · p.2 Development Impact Fee Schedule, Single Family (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Parks and recreation development impact fee, single family parks | $1,194 per housing unit per housing unit | $1,194 | Printed Effective 2025-09-08 Source · p.2 Development Impact Fee Schedule, Single Family (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Police development impact fee, single family police | $702 per housing unit per housing unit | $702 | Printed Effective 2025-09-08 Source · p.2 Development Impact Fee Schedule, Single Family (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Streets development impact fee, single family transportation | $4,270 per housing unit per housing unit | $4,270 | Printed Effective 2025-09-08 Source · p.2 Development Impact Fee Schedule, Single Family (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Water utility development fee, 0.75-inch meter, East Glendale (highest area; West Glendale $0) water | $3,330 per meter, by size and area | $3,330 | Printed; East Glendale is the highest area, West Glendale is $0 for all meter sizes Effective 2025-09-08 Source · p.1 East Glendale Utility Development Fees (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Wastewater utility development fee, 0.75-inch meter, East Glendale (highest area; West Glendale $0) sewer | $3,795 per meter, by size and area | $3,795 | Printed Effective 2025-09-08 Source · p.1 East Glendale Utility Development Fees (updated 06/24/2026) fetched 2026-11-07, sha256 9e6fc705c733 |
| Building permit (valuation-based, Table 3A) permit · computed | $1257.16 for the first $100,000.00 plus $7.07 for each additional $1,000.00 by valuation, $100,001 to $500,000 | $3,243.83 | Valuation = 2,000 sq ft x $175.92 (ICC BVD R-3 V-B) + 400 sq ft garage x $71.07 (U V-B) = $380,268.00; $1,257.16 + $7.07 x 281 (each $1,000 or fraction over $100,000) = $3,243.83. Glendale values work from the ICC Building Valuation Data (its Table 3B chart page is blank in the posted PDF); values from the ICC table printed in Raleigh's FY27 guide (source 15) Effective 2019-05-10 Source · Table 3A Building Permit Fees fetched 2026-11-07, sha256 33b6a88ba440 |
| Building plan review permit · computed | 75% of permit fee (min. $122.88) percent of permit fee | $2,432.87 | 75% x $3,243.83 = $2,432.87 Effective 2019-05-10 Source · Building Plan Review fetched 2026-11-07, sha256 33b6a88ba440 |
| Total listed | $20,172.70 |
Fee-change calendar
- None recorded
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.