Chandler, AZ
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: water meter installation (the SDF schedule says water does not include it; no amount in the city schedule), water and sewer service taps and connections (no residential amount posted), civil plan review fees, solid waste fees, utility deposits, school and other district fees. Parks fee uses the highest of three service areas (SE $5,242; NE $129; NW $0) and arterial streets applies only inside the arterial impact fee area. Building valuation uses ICC Building Valuation Data (R-3 and U, type V-B) as printed in another city's guide, labelled computed; 2,000 sq ft heated plus 400 sq ft garage. The SDF schedule (effective July 1 2024) is an image-only PDF: amounts were read visually from the rendered page and transcribed into the stored source text. Citywide Fee Schedule effective March 2 2026.
Water/sewer provider: City of Chandler
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Fire system development fee, single family fire | $308.00 per unit | $308 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Police system development fee, single family police | $74.00 per unit | $74 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Parks system development fee, SE Service Area (highest area; NE $129.00, NW $0.00) parks | $5,242.00 per unit, by service area | $5,242 | Printed. Single-family, per unit; highest of three service areas Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Public buildings system development fee, single family general | $110.00 per unit | $110 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Water system development fee (does not include meter installation) water | $2,460.00 per unit | $2,460 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Wastewater system development fee sewer | $5,989.00 per unit | $5,989 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Reclaimed water system development fee water | $1,094.00 per unit | $1,094 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Arterial streets system development fee (applies only in certain areas; highest case used) transportation | $3,792.00 per unit, arterial street impact fee area | $3,792 | Printed. Single-family, per unit Effective 2024-07-01 Source · p.2 System Development Fee Schedule (Municode Sec. 38) fetched 2026-11-08, sha256 253a66d22701 |
| Building permit (valuation-based) permit · computed | $893.00 for the first $100,000 plus $5.00 for each additional $1,000 by valuation, $100,001 to $500,000 | $2,298 | Valuation = 2,000 sq ft x $175.92 (ICC BVD R-3 V-B) + 400 sq ft garage x $71.07 (U V-B) = $380,268.00; $893.00 + $5.00 x 281 (each $1,000 or fraction over $100,000) = $2,298.00. Chandler bases new-construction valuation on the current ICC Building Valuation Data; values from the ICC table printed in Raleigh's FY27 guide (source 15) Effective 2026-03-02 Source · Sec. 4.6.1 Building Permit Fees fetched 2026-11-07, sha256 624ae9c4413a |
| Building plan review fee permit · computed | 65% of building permit fee percent of permit fee | $1,493.70 | 65% x $2,298.00 = $1,493.70 Effective 2026-03-02 Source · Sec. 4.6.2 Building Plan Review Fees fetched 2026-11-07, sha256 624ae9c4413a |
| Total listed | $22,860.70 |