Site-work prices, Portsmouth city, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON2n/an/a
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $1,150.00 per TON · qty 37.40 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $1,100.00 per TON · qty 63 · bid tab outlier, not in the median
Curb gutterLF1n/an/a
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $350.00 per LF · qty 54 · bid tab outlier, not in the median
Excavation embankmentCY1$90.00$90.00 to $90.00
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $90.00 per CY · qty 7,120 · bid tab
Inlet headwallEA13$20,000.00$20,000.00 to $25,000.00
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 2 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 1 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 8 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 6 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 2 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 1 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 13 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $25,000.00 per EA · qty 6 · bid tab
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $35,000.00 per EA · qty 4 · bid tab outlier, not in the median
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $20,000.00 per EA · qty 1 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
Lime cement stabilizationTON1$500.00$500.00 to $500.00
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $500.00 per TON · qty 19 · bid tab
ManholeEA5$5,000.00$3,605.00 to $7,450.00
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $5,100.00 per EA · qty 11 · bid tab
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $3,605.00 per EA · qty 2 · bid tab
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $7,450.00 per EA · qty 16 · bid tab
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $4,500.00 per EA · qty 67 · bid tab
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $5,000.00 per EA · qty 7 · bid tab
Storm pipe 15-inchLF1n/an/a
Bids
  • 2025-10-22 · VDOT (Hampton Roads (5)) · C000117033M01D · $600.00 per LF · qty 360 · bid tab outlier, not in the median

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.