Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON6$208.00$162.00 to $355.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $266.00 per TON · qty 9,416 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $162.00 per TON · qty 8,655 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $162.00 per TON · qty 5,488 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $355.00 per TON · qty 81 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $194.00 per TON · qty 11,928 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $222.00 per TON · qty 93,858 · bid tab
Curb gutterLF6$33.00$30.00 to $45.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $36.00 per LF · qty 1,229 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $45.00 per LF · qty 561 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $36.00 per LF · qty 1,919 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $30.00 per LF · qty 610 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $30.00 per LF · qty 737 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $30.00 per LF · qty 216 · bid tab
Curb gutterTON1$770.00$770.00 to $770.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $770.00 per TON · qty 24 · bid tab
Excavation embankmentCY1$20.00$20.00 to $20.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $20.00 per CY · qty 54,359 · bid tab
Inlet headwallEA17$10,000.00$1,500.00 to $18,000.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 1 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 2 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $12,000.00 per EA · qty 4 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $7,500.00 per EA · qty 2 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 4 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 4 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $5,000.00 per EA · qty 17 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 1 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 88 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $15,000.00 per EA · qty 1 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
Lime cement stabilizationSY1$3.00$3.00 to $3.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $3.00 per SY · qty 18,822 · bid tab
Lime cement stabilizationTON1$120.00$120.00 to $120.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $120.00 per TON · qty 173 · bid tab
ManholeEA2$4,545.00$3,720.00 to $5,370.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $3,720.00 per EA · qty 14 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $5,370.00 per EA · qty 2 · bid tab
Sewer main 16-inchLF1$425.00$425.00 to $425.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $425.00 per LF · qty 292 · bid tab
Sewer main 20-inchLF1$490.00$490.00 to $490.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $490.00 per LF · qty 376 · bid tab
Sewer main 8-inchLF1$230.00$230.00 to $230.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $230.00 per LF · qty 334 · bid tab
Sewer serviceLF1$130.00$130.00 to $130.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $130.00 per LF · qty 37 · bid tab
SidewalkSY1$61.50$61.50 to $61.50
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $61.50 per SY · qty 1,210 · bid tab
Storm pipe 15-inchLF1$150.00$150.00 to $150.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $150.00 per LF · qty 9,539 · bid tab
Storm pipe 18-inchLF1$180.00$180.00 to $180.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $180.00 per LF · qty 13,499 · bid tab
Storm pipe 21-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $200.00 per LF · qty 495 · bid tab
Storm pipe 24-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $200.00 per LF · qty 2,894 · bid tab
Storm pipe 30-inchLF1$185.00$185.00 to $185.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $185.00 per LF · qty 861 · bid tab
Storm pipe 36-inchLF1$400.00$400.00 to $400.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $400.00 per LF · qty 12 · bid tab
Water main 12-inchLF1$315.00$315.00 to $315.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $315.00 per LF · qty 985 · bid tab
Water main 6-inchLF1$530.00$530.00 to $530.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $530.00 per LF · qty 8 · bid tab
Water serviceLF1$135.00$135.00 to $135.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $135.00 per LF · qty 185 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.