Site-work prices, Emporia city, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Curb gutterLF4$70.00$70.00 to $100.00
Bids
  • 2025-01-22 · VDOT (Hampton Roads (5)) · CM525PM1125498 · $100.00 per LF · qty 180 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $70.00 per LF · qty 58 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $70.00 per LF · qty 18 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $70.00 per LF · qty 7 · bid tab
Lime cement stabilizationTON1$400.00$400.00 to $400.00
Bids
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $400.00 per TON · qty 0.25 · bid tab
SidewalkSY2$47.50$20.00 to $75.00
Bids
  • 2025-01-22 · VDOT (Hampton Roads (5)) · CM525PM1125498 · $20.00 per SY · qty 155 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $75.00 per SY · qty 51 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.