Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON14$192.50$117.00 to $360.00
Bids
  • 2026-06-10 · LaDOTD · JIM CRYER LANE OVER BAYOU ANACOCO · $250.00 per TON · qty 470.60 · bid tab
  • 2026-06-10 · LaDOTD · JIM CRYER LANE OVER BAYOU ANACOCO · $300.00 per TON · qty 54.60 · bid tab
  • 2026-03-11 · LaDOTD · LA 10: LA 467-1 TO LOOK OUT RD · $330.00 per TON · qty 225.50 · bid tab
  • 2026-03-11 · LaDOTD · LA 10: LA 467-1 TO LOOK OUT RD · $144.00 per TON · qty 5,721.30 · bid tab
  • 2025-11-17 · LaDOTD · LA 467-1: LA 10 TO FORT POLK SOUTH GATE · $190.00 per TON · qty 3,425 · bid tab
  • 2025-08-13 · LaDOTD · LA 117: TANK TRAIL RD INTERSECTION IMP · $184.60 per TON · qty 272.70 · bid tab
  • 2025-08-13 · LaDOTD · LA 117: TANK TRAIL RD INTERSECTION IMP · $184.60 per TON · qty 503.90 · bid tab
  • 2025-06-11 · LaDOTD · HOLTON HARRIS ROAD BRIDGE · $360.00 per TON · qty 147.50 · bid tab
  • 2024-12-11 · LaDOTD · LA 111: US 171 - LA 117 · $117.00 per TON · qty 25,236.90 · bid tab
  • 2024-12-11 · LaDOTD · LA 111: US 171 - LA 117 · $195.00 per TON · qty 2,715 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
Excavation embankmentCY3$38.00$30.00 to $100.00
Bids
  • 2026-03-11 · LaDOTD · LA 10: LA 467-1 TO LOOK OUT RD · $100.00 per CY · qty 677 · bid tab
  • 2024-12-11 · LaDOTD · LA 111: US 171 - LA 117 · $30.00 per CY · qty 2,255 · bid tab
  • 2024-05-08 · LaDOTD · LA 121: LA 8 - LA 28 · $38.00 per CY · qty 3,041 · bid tab
Flexible baseCY2$185.00$155.00 to $215.00
Bids
  • 2026-06-10 · LaDOTD · JIM CRYER LANE OVER BAYOU ANACOCO · $155.00 per CY · qty 590.70 · bid tab
  • 2025-06-11 · LaDOTD · HOLTON HARRIS ROAD BRIDGE · $215.00 per CY · qty 175.80 · bid tab
Flexible baseSY2$22.09$19.18 to $25.00
Bids
  • 2025-08-13 · LaDOTD · LA 117: TANK TRAIL RD INTERSECTION IMP · $19.18 per SY · qty 3,609.20 · bid tab
  • 2024-11-13 · LaDOTD · LA 8: FORKER CREEK BRIDGE · $25.00 per SY · qty 6,696.40 · bid tab
Lime cement stabilizationSY4$14.62$5.50 to $26.34
Bids
  • 2025-08-13 · LaDOTD · LA 117: TANK TRAIL RD INTERSECTION IMP · $26.34 per SY · qty 904 · bid tab
  • 2024-12-11 · LaDOTD · LA 111: US 171 - LA 117 · $15.25 per SY · qty 90,391 · bid tab
  • 2024-12-11 · LaDOTD · LA 111: US 171 - LA 117 · $5.50 per SY · qty 10,222 · bid tab
  • 2024-05-08 · LaDOTD · LA 121: LA 8 - LA 28 · $14.00 per SY · qty 43,061.10 · bid tab
Lime cement stabilizationTON2$567.50$535.00 to $600.00
Bids
  • 2025-08-13 · LaDOTD · LA 117: TANK TRAIL RD INTERSECTION IMP · $600.00 per TON · qty 12.78 · bid tab
  • 2024-12-11 · LaDOTD · LA 111: US 171 - LA 117 · $535.00 per TON · qty 96.60 · bid tab
ManholeEA1$1,600.00$1,600.00 to $1,600.00
Bids
  • 2026-03-11 · LaDOTD · LA 10: LA 467-1 TO LOOK OUT RD · $1,600.00 per EA · qty 1 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.