Site-work prices, Tensas Parish, LA
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| Asphalt pavement | TON | 10 | $160.00 | $147.00 to $400.00 | Bids- 2025-11-12 · LaDOTD · LA 568: LA 3209 - US 65 · $400.00 per TON · qty 61.30 · bid tab
- 2025-11-12 · LaDOTD · LA 568: LA 3209 - US 65 · $175.00 per TON · qty 2,473.20 · bid tab
- 2024-07-10 · LaDOTD · LA 573: COOTER POINT RD. - LA 892 · $150.00 per TON · qty 379.60 · bid tab
- 2024-07-10 · LaDOTD · LA 573: COOTER POINT RD. - LA 892 · $150.00 per TON · qty 10,254.20 · bid tab
- 2024-07-10 · LaDOTD · LA 608: LA 605 - 4.1 MILES EAST · $165.00 per TON · qty 353.10 · bid tab
- 2024-07-10 · LaDOTD · LA 608: LA 605 - 4.1 MILES EAST · $165.00 per TON · qty 5,618.30 · bid tab
- 2024-02-14 · LaDOTD · LA 568: LA 569 - US 65 · $155.00 per TON · qty 8,078.90 · bid tab multi-county contract
- 2024-02-14 · LaDOTD · LA 568: LA 569 - US 65 · $155.00 per TON · qty 2,947.60 · bid tab multi-county contract
- 2024-02-14 · LaDOTD · LA 3252: LA 573 - LA 892 · $240.00 per TON · qty 655 · bid tab
- 2024-02-14 · LaDOTD · LA 3252: LA 573 - LA 892 · $147.00 per TON · qty 9,070.80 · bid tab
|
| Curb gutter | LF | 1 | $50.00 | $50.00 to $50.00 | Bids- 2024-02-14 · LaDOTD · LA 568: LA 569 - US 65 · $50.00 per LF · qty 54 · bid tab multi-county contract
|
| Excavation embankment | CY | 5 | $35.00 | $25.00 to $100.00 | Bids- 2025-11-12 · LaDOTD · LA 568: LA 3209 - US 65 · $100.00 per CY · qty 19.20 · bid tab
- 2024-07-10 · LaDOTD · LA 573: COOTER POINT RD. - LA 892 · $25.00 per CY · qty 260 · bid tab
- 2024-07-10 · LaDOTD · LA 608: LA 605 - 4.1 MILES EAST · $35.00 per CY · qty 201 · bid tab
- 2024-02-14 · LaDOTD · LA 568: LA 569 - US 65 · $40.00 per CY · qty 605 · bid tab multi-county contract
- 2024-02-14 · LaDOTD · LA 3252: LA 573 - LA 892 · $35.00 per CY · qty 606 · bid tab
|
Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.
All Louisiana site-work prices by county · Louisiana coverage