PadstakeGet the fee reports
Menu

Site-work prices, St. Mary Parish, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON6$173.68$118.00 to $405.00
Bids
  • 2026-08-12 · LaDOTD · US 90: 1.6 MI S LA 317-1.2 MI N WAX LAKE B · $147.36 per TON · qty 32,848.90 · bid tab
  • 2026-05-13 · LaDOTD · LA 182: US 90 - GREENWOOD ST. OVERPASS · $200.00 per TON · qty 270 · bid tab
  • 2026-05-13 · LaDOTD · LA 182: US 90 - GREENWOOD ST. OVERPASS · $118.00 per TON · qty 19,396 · bid tab
  • 2024-11-13 · LaDOTD · LA 3211: RR CROSSING - LA 182 · $200.00 per TON · qty 257 · bid tab
  • 2024-11-13 · LaDOTD · LA 3211: RR CROSSING - LA 182 · $125.00 per TON · qty 5,043.90 · bid tab
  • 2024-08-28 · LaDOTD · US 90-W: US 90 OVER BAYOU RAMOS REPAIRS · $405.00 per TON · qty 99.80 · bid tab
Curb gutterLF3$55.00$30.00 to $75.00
Bids
  • 2026-05-13 · LaDOTD · LA 182: US 90 - GREENWOOD ST. OVERPASS · $55.00 per LF · qty 133 · bid tab
  • 2025-11-12 · LaDOTD · MORGAN CITY SIDEWALKS: DOWNTOWN & MYRTLE · $30.00 per LF · qty 377 · bid tab
  • 2024-11-13 · LaDOTD · LA 3211: RR CROSSING - LA 182 · $75.00 per LF · qty 153.50 · bid tab
Excavation embankmentCY3$43.14$43.14 to $43.14
Bids
  • 2026-08-12 · LaDOTD · US 90: 1.6 MI S LA 317-1.2 MI N WAX LAKE B · $43.14 per CY · qty 1,798 · bid tab
  • 2026-05-13 · LaDOTD · LA 182: US 90 - GREENWOOD ST. OVERPASS · $350.00 per CY · qty 30 · bid tab outlier, not in the median
  • 2024-11-13 · LaDOTD · LA 3211: RR CROSSING - LA 182 · $150.00 per CY · qty 100 · bid tab outlier, not in the median
Lime cement stabilizationSY1$13.25$13.25 to $13.25
Bids
  • 2024-11-13 · LaDOTD · LA 3211: RR CROSSING - LA 182 · $13.25 per SY · qty 12,639 · bid tab
ManholeEA3$2,900.00$1,400.00 to $5,200.00
Bids
  • 2025-11-12 · LaDOTD · MORGAN CITY SIDEWALKS: DOWNTOWN & MYRTLE · $5,200.00 per EA · qty 17 · bid tab
  • 2025-11-12 · LaDOTD · MORGAN CITY SIDEWALKS: DOWNTOWN & MYRTLE · $2,900.00 per EA · qty 1 · bid tab
  • 2025-11-12 · LaDOTD · MORGAN CITY SIDEWALKS: DOWNTOWN & MYRTLE · $1,400.00 per EA · qty 4 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.

All Louisiana site-work prices by county · Louisiana coverage