Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON39$171.07$64.00 to $400.00
Bids
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $128.00 per TON · qty 18,719.70 · bid tab
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $80.00 per TON · qty 297.20 · bid tab
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $191.38 per TON · qty 990.80 · bid tab
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $167.14 per TON · qty 2,813.20 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $64.00 per TON · qty 1,555.40 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $189.00 per TON · qty 9,810.50 · bid tab
  • 2026-06-24 · LaDOTD · SOLID WASTE ROAD OVER BAYOU BOEUF · $312.00 per TON · qty 169.10 · bid tab
  • 2026-06-24 · LaDOTD · SOLID WASTE ROAD OVER BAYOU BOEUF · $400.00 per TON · qty 84.80 · bid tab
  • 2026-05-13 · LaDOTD · US 190: R-CUT AT LA 741 · $395.00 per TON · qty 74.80 · bid tab
  • 2026-05-13 · LaDOTD · US 190: R-CUT AT LA 741 · $179.00 per TON · qty 10,551 · bid tab
(10 most recent of 39 shown; all in the Hubstake feed)
Concrete pavementSY2$245.00$165.00 to $325.00
Bids
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $325.00 per SY · qty 75 · bid tab multi-county contract
  • 2024-10-09 · LaDOTD · LA 31/LA 182: LA 742 - 0.355MI. N. LA 31 · $165.00 per SY · qty 59.60 · bid tab
Curb gutterLF5$67.00$32.00 to $120.00
Bids
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $79.00 per LF · qty 200 · bid tab
  • 2026-05-13 · LaDOTD · US 190: R-CUT AT LA 741 · $32.00 per LF · qty 3,251.80 · bid tab
  • 2026-01-07 · LaDOTD · LA 13: EMER. CROSS DRAIN REPLACEMENT · $120.00 per LF · qty 65 · bid tab
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $250.00 per LF · qty 127 · bid tab multi-county contract outlier, not in the median
  • 2024-10-09 · LaDOTD · LA 31/LA 182: LA 742 - 0.355MI. N. LA 31 · $55.00 per LF · qty 110.20 · bid tab
Excavation embankmentCY16$43.75$15.00 to $105.00
Bids
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $15.00 per CY · qty 650 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $32.00 per CY · qty 473 · bid tab
  • 2026-01-07 · LaDOTD · LA 13: EMER. CROSS DRAIN REPLACEMENT · $360.00 per CY · qty 15 · bid tab outlier, not in the median
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $30.00 per CY · qty 6,771 · bid tab multi-county contract
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $42.50 per CY · qty 2,781 · bid tab multi-county contract
  • 2025-12-10 · LaDOTD · I-49: I-10 - ST. LANDRY P/L · $125.00 per CY · qty 5,290 · bid tab multi-county contract outlier, not in the median
  • 2025-06-25 · LaDOTD · LA 10 BRIDGES · $27.00 per CY · qty 10,178 · bid tab
  • 2025-05-14 · LaDOTD · LA 178: W. JCT. LA 182 - E. JCT. LA 182 · $45.00 per CY · qty 1,307 · bid tab
  • 2025-05-14 · LaDOTD · LA 343: LA 98 - LA 356 · $80.00 per CY · qty 1,279 · bid tab
  • 2025-02-12 · LaDOTD · LA 755: LA 368 - LA 91 · $50.00 per CY · qty 500 · bid tab multi-county contract
(10 most recent of 16 shown; all in the Hubstake feed)
Flexible baseSY7$42.00$20.00 to $54.00
Bids
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $37.03 per SY · qty 978 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $20.00 per SY · qty 1,710.30 · bid tab
  • 2026-06-24 · LaDOTD · SOLID WASTE ROAD OVER BAYOU BOEUF · $53.00 per SY · qty 639.60 · bid tab
  • 2026-05-13 · LaDOTD · US 190: R-CUT AT LA 741 · $42.00 per SY · qty 12,047.50 · bid tab
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $40.00 per SY · qty 4,493 · bid tab multi-county contract
  • 2025-06-25 · LaDOTD · LA 10 BRIDGES · $50.00 per SY · qty 9,946.60 · bid tab
  • 2025-06-11 · LaDOTD · LA 10: BAYOU CARRON BRIDGE · $54.00 per SY · qty 3,107.10 · bid tab
Inlet headwallEA9n/an/a
Bids
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $55,000.00 per EA · qty 2 · bid tab outlier, not in the median
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $88,824.45 per EA · qty 2 · bid tab outlier, not in the median
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $66,503.45 per EA · qty 2 · bid tab outlier, not in the median
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $110,000.00 per EA · qty 6 · bid tab outlier, not in the median
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $100,000.00 per EA · qty 2 · bid tab multi-county contract outlier, not in the median
  • 2025-05-14 · LaDOTD · LA 178: W. JCT. LA 182 - E. JCT. LA 182 · $49,500.00 per EA · qty 2 · bid tab outlier, not in the median
  • 2025-05-14 · LaDOTD · LA 343: LA 98 - LA 356 · $80,000.00 per EA · qty 2 · bid tab outlier, not in the median
  • 2024-09-18 · LaDOTD · LA 10: LITTLE WAUKSHA BR - US 71 · $75,000.00 per EA · qty 2 · bid tab outlier, not in the median
  • 2024-04-16 · LaDOTD · LA 10: EMER. CROSS DRAIN REPLACEMENT · $45,000.00 per EA · qty 2 · bid tab outlier, not in the median
Lime cement stabilizationSY26$11.00$2.25 to $18.00
Bids
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $15.00 per SY · qty 59,692 · bid tab
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $11.00 per SY · qty 6,933 · bid tab
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $4.75 per SY · qty 6,933 · bid tab
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $6.75 per SY · qty 3,400 · bid tab
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $11.81 per SY · qty 5,822 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $16.33 per SY · qty 32,876 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $12.70 per SY · qty 31,166 · bid tab
  • 2026-06-24 · LaDOTD · SOLID WASTE ROAD OVER BAYOU BOEUF · $10.00 per SY · qty 640 · bid tab
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $18.00 per SY · qty 20,932.40 · bid tab multi-county contract
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $14.00 per SY · qty 20,933 · bid tab multi-county contract
(10 most recent of 26 shown; all in the Hubstake feed)
Lime cement stabilizationTON9$410.00$300.00 to $550.00
Bids
  • 2026-08-12 · LaDOTD · LA 10: PALMETTO - US 71 · $420.00 per TON · qty 54.60 · bid tab
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $369.87 per TON · qty 48.19 · bid tab
  • 2026-06-24 · LaDOTD · SOLID WASTE ROAD OVER BAYOU BOEUF · $300.00 per TON · qty 24.48 · bid tab
  • 2025-12-10 · LaDOTD · LA 29: LA 13 - LA 758 · $450.00 per TON · qty 123.64 · bid tab multi-county contract
  • 2025-06-11 · LaDOTD · LA 10: BAYOU CARRON BRIDGE · $300.00 per TON · qty 43 · bid tab
  • 2025-05-14 · LaDOTD · LA 178: W. JCT. LA 182 - E. JCT. LA 182 · $350.00 per TON · qty 169 · bid tab
  • 2025-05-14 · LaDOTD · LA 343: LA 98 - LA 356 · $415.00 per TON · qty 235.90 · bid tab
  • 2025-02-12 · LaDOTD · LA 755: LA 368 - LA 91 · $550.00 per TON · qty 109 · bid tab multi-county contract
  • 2025-01-08 · LaDOTD · LA 359: LOCAL ROAD (BOLDEN)-LA 10 · $410.00 per TON · qty 125.85 · bid tab
ManholeEA13$1,556.00$1,114.00 to $13,538.34
Bids
  • 2026-08-12 · LaDOTD · LA 755-S: LA 755 - LA 91 · $13,538.34 per EA · qty 1 · bid tab
  • 2026-07-08 · LaDOTD · LA 104: 2.6 MI NW US 190 - US 190 · $8,000.00 per EA · qty 1 · bid tab
  • 2026-05-13 · LaDOTD · US 190: R-CUT AT LA 741 · $7,300.00 per EA · qty 1 · bid tab
  • 2025-11-12 · LaDOTD · I-49: LA 3233 INTCHG LIGHTING (OPEL.) · $471.00 per EA · qty 49 · bid tab outlier, not in the median
  • 2025-11-12 · LaDOTD · I-49: LA 3233 INTCHG LIGHTING (OPEL.) · $1,289.00 per EA · qty 4 · bid tab
  • 2025-11-12 · LaDOTD · I-49: LA 3233 INTCHG LIGHTING (OPEL.) · $706.00 per EA · qty 13 · bid tab outlier, not in the median
  • 2025-05-14 · LaDOTD · LA 178: W. JCT. LA 182 - E. JCT. LA 182 · $29,150.00 per EA · qty 1 · bid tab outlier, not in the median
  • 2024-12-11 · LaDOTD · I-49: US 190 INTCHG LIGHTING (OPELOUSAS) · $1,250.00 per EA · qty 4 · bid tab
  • 2024-12-11 · LaDOTD · I-49: US 190 INTCHG LIGHTING (OPELOUSAS) · $1,300.00 per EA · qty 26 · bid tab
  • 2024-12-11 · LaDOTD · I-49: US 190 INTCHG LIGHTING (OPELOUSAS) · $750.00 per EA · qty 27 · bid tab outlier, not in the median
(10 most recent of 13 shown; all in the Hubstake feed)

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.