PadstakeGet the fee reports
Menu

Site-work prices, St. Bernard Parish, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON11$300.00$100.00 to $452.00
Bids
  • 2026-09-15 · LaDOTD · LA 39: CROSS DRAIN REP'L 1800' N LA 46 · $300.00 per TON · qty 6 · bid tab
  • 2025-09-10 · LaDOTD · LA 39: 155' S. LA 46 - FLOODWALL · $290.00 per TON · qty 157.80 · bid tab multi-county contract
  • 2025-09-10 · LaDOTD · LA 39: 155' S. LA 46 - FLOODWALL · $110.00 per TON · qty 3,406.50 · bid tab multi-county contract
  • 2024-11-13 · LaDOTD · LA 300: BAYOU LALOUTRE BRIDGE · $360.00 per TON · qty 466.30 · bid tab
  • 2024-11-13 · LaDOTD · LA 300: BAYOU LALOUTRE BRIDGE · $360.00 per TON · qty 50.70 · bid tab
  • 2024-11-13 · LaDOTD · LA 300: LA 39 - 2215 LA 300 · $100.00 per TON · qty 380 · bid tab
  • 2024-11-13 · LaDOTD · LA 300: LA 39 - 2215 LA 300 · $140.00 per TON · qty 1,125.40 · bid tab
  • 2024-08-28 · LaDOTD · LA 47: Bayou Bienvenue Br Replacement · $350.00 per TON · qty 65.60 · bid tab multi-county contract
  • 2024-08-28 · LaDOTD · LA 47: Bayou Bienvenue Br Replacement · $350.00 per TON · qty 473 · bid tab multi-county contract
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $260.00 per TON · qty 412.90 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
Concrete pavementSY3$121.00$104.00 to $121.00
Bids
  • 2025-10-15 · LaDOTD · LA 39 PATCHING: NORTON AVE - PARIS RD · $104.00 per SY · qty 171.70 · bid tab
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $121.00 per SY · qty 1,479.10 · bid tab
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $121.00 per SY · qty 1,000.40 · bid tab
Curb gutterLF7$50.00$18.00 to $70.00
Bids
  • 2026-02-11 · LaDOTD · LA 39: W. JUDGE PEREZ DR. ENHANCEMENTS · $28.00 per LF · qty 299.10 · bid tab
  • 2025-10-15 · LaDOTD · LA 39 PATCHING: NORTON AVE - PARIS RD · $18.00 per LF · qty 2,746 · bid tab
  • 2025-01-08 · LaDOTD · ST. BERNARD PEDESTRIAN IMPROVEMENTS · $60.00 per LF · qty 70 · bid tab
  • 2024-12-11 · LaDOTD · JEAN LAFITTE PARKWAY SHARED USE PATH · $70.00 per LF · qty 96 · bid tab
  • 2024-08-28 · LaDOTD · LA 47: Bayou Bienvenue Br Replacement · $20.00 per LF · qty 1,373.30 · bid tab multi-county contract
  • 2024-08-28 · LaDOTD · LA 47: Bayou Bienvenue Br Replacement · $50.00 per LF · qty 400 · bid tab multi-county contract
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $65.00 per LF · qty 933.90 · bid tab
Excavation embankmentCY11$65.00$28.00 to $95.00
Bids
  • 2026-09-15 · LaDOTD · LA 39: CROSS DRAIN REP'L 1800' N LA 46 · $175.00 per CY · qty 20 · bid tab outlier, not in the median
  • 2026-02-11 · LaDOTD · LA 39: W. JUDGE PEREZ DR. ENHANCEMENTS · $95.00 per CY · qty 227 · bid tab
  • 2025-10-15 · LaDOTD · LA 39 PATCHING: NORTON AVE - PARIS RD · $136.00 per CY · qty 9 · bid tab outlier, not in the median
  • 2025-10-15 · LaDOTD · LA 39 PATCHING: NORTON AVE - PARIS RD · $70.00 per CY · qty 135 · bid tab
  • 2025-09-10 · LaDOTD · LA 39: 155' S. LA 46 - FLOODWALL · $145.00 per CY · qty 225 · bid tab multi-county contract outlier, not in the median
  • 2024-12-11 · LaDOTD · JEAN LAFITTE PARKWAY SHARED USE PATH · $65.00 per CY · qty 716 · bid tab
  • 2024-11-13 · LaDOTD · LA 300: BAYOU LALOUTRE BRIDGE · $52.00 per CY · qty 760 · bid tab
  • 2024-11-13 · LaDOTD · LA 300: LA 39 - 2215 LA 300 · $65.00 per CY · qty 40 · bid tab
  • 2024-08-28 · LaDOTD · LA 47: Bayou Bienvenue Br Replacement · $250.00 per CY · qty 145 · bid tab multi-county contract outlier, not in the median
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $35.00 per CY · qty 205 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
Flexible baseCY1$68.00$68.00 to $68.00
Bids
  • 2025-10-15 · LaDOTD · LA 39 PATCHING: NORTON AVE - PARIS RD · $68.00 per CY · qty 23.20 · bid tab
Flexible baseSY2$30.00$21.00 to $39.00
Bids
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $39.00 per SY · qty 2,070.50 · bid tab
  • 2024-04-17 · LaDOTD · LA 46 @ WEINBERGER RD INTERSECTION · $21.00 per SY · qty 3,590.20 · bid tab
Lime cement stabilizationTON1$800.00$800.00 to $800.00
Bids
  • 2024-12-11 · LaDOTD · JEAN LAFITTE PARKWAY SHARED USE PATH · $800.00 per TON · qty 1.66 · bid tab
ManholeEA3$1,634.38$1,634.38 to $1,634.38
Bids
  • 2025-12-18 · LaDOTD · DIST. 02 DISTRICTWIDE LOOP DETECTION REPAIRS · $1,634.38 per EA · qty 1 · bid tab multi-county contract
  • 2025-12-18 · LaDOTD · DIST. 02 DISTRICTWIDE LOOP DETECTION REPAIRS · $1,634.38 per EA · qty 1 · bid tab multi-county contract
  • 2025-12-18 · LaDOTD · DIST. 02 DISTRICTWIDE LOOP DETECTION REPAIRS · $1,634.38 per EA · qty 2 · bid tab multi-county contract
SidewalkEA1$1,450.00$1,450.00 to $1,450.00
Bids
  • 2024-11-13 · LaDOTD · LA 300: LA 39 - 2215 LA 300 · $1,450.00 per EA · qty 7 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.

All Louisiana site-work prices by county · Louisiana coverage