Site-work prices, Iberville Parish, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON10$135.00$100.00 to $318.00
Bids
  • 2026-01-14 · LaDOTD · LA 1: ASCENSION P/L - LA 69 · $100.00 per TON · qty 19,944.50 · bid tab
  • 2026-01-14 · LaDOTD · LA 1: ASCENSION P/L - LA 69 · $100.00 per TON · qty 516.10 · bid tab
  • 2025-08-13 · LaDOTD · LA 30: LA 74 - EBR P/L · $125.00 per TON · qty 438 · bid tab
  • 2025-08-13 · LaDOTD · LA 30: LA 74 - EBR P/L · $100.00 per TON · qty 18,906.80 · bid tab
  • 2025-07-09 · LaDOTD · I-10: TRINITY DRAINAGE CANAL BR REPAIR · $1,500.00 per TON · qty 0.80 · bid tab outlier, not in the median
  • 2025-04-09 · LaDOTD · LA 404: BAYOU AND CANAL BRIDGES · $248.00 per TON · qty 1,418.80 · bid tab
  • 2025-04-09 · LaDOTD · LA 404: BAYOU AND CANAL BRIDGES · $318.00 per TON · qty 345 · bid tab
  • 2024-11-13 · LaDOTD · LA 69: 0.5 MI N OF LA 404 - LA 1 · $135.00 per TON · qty 2,260 · bid tab
  • 2023-12-13 · LaDOTD · LA 1270: LA77 TO END OF CONTROL SECTION · $185.00 per TON · qty 229.10 · bid tab
  • 2023-12-13 · LaDOTD · LA 1270: LA77 TO END OF CONTROL SECTION · $143.00 per TON · qty 2,267 · bid tab
Curb gutterLF2$38.50$22.00 to $55.00
Bids
  • 2026-01-14 · LaDOTD · LA 1: ASCENSION P/L - LA 69 · $22.00 per LF · qty 400 · bid tab
  • 2024-11-13 · LaDOTD · LA 69: 0.5 MI N OF LA 404 - LA 1 · $55.00 per LF · qty 400 · bid tab
Excavation embankmentCY4$50.00$45.00 to $100.00
Bids
  • 2026-01-14 · LaDOTD · LA 1: ASCENSION P/L - LA 69 · $45.00 per CY · qty 331 · bid tab
  • 2025-08-13 · LaDOTD · LA 30: LA 74 - EBR P/L · $186.79 per CY · qty 206 · bid tab outlier, not in the median
  • 2025-07-09 · LaDOTD · I-10: TRINITY DRAINAGE CANAL BR REPAIR · $50.00 per CY · qty 8 · bid tab
  • 2023-12-13 · LaDOTD · LA 1270: LA77 TO END OF CONTROL SECTION · $100.00 per CY · qty 60 · bid tab
Inlet headwallCY1n/an/a
Bids
  • 2025-07-09 · LaDOTD · I-10: TRINITY DRAINAGE CANAL BR REPAIR · $3,000.00 per CY · qty 7.26 · bid tab outlier, not in the median
Inlet headwallEA1n/an/a
Bids
  • 2025-04-09 · LaDOTD · LA 404: BAYOU AND CANAL BRIDGES · $39,000.00 per EA · qty 2 · bid tab outlier, not in the median
Lime cement stabilizationSY1$19.00$19.00 to $19.00
Bids
  • 2025-04-09 · LaDOTD · LA 404: BAYOU AND CANAL BRIDGES · $19.00 per SY · qty 1,693 · bid tab
Lime cement stabilizationTON1$900.00$900.00 to $900.00
Bids
  • 2025-04-09 · LaDOTD · LA 404: BAYOU AND CANAL BRIDGES · $900.00 per TON · qty 23.69 · bid tab
ManholeEA7$1,700.00$1,130.16 to $6,000.00
Bids
  • 2026-05-13 · LaDOTD · LA 30 @ LA 74 FYA SIGNAL UPGRADE · $1,260.32 per EA · qty 10 · bid tab
  • 2026-05-13 · LaDOTD · LA 30 @ LA 74 FYA SIGNAL UPGRADE · $1,948.57 per EA · qty 1 · bid tab
  • 2026-05-13 · LaDOTD · LA 30 @ LA 74 FYA SIGNAL UPGRADE · $1,130.16 per EA · qty 3 · bid tab
  • 2026-01-14 · LaDOTD · LA 1: ASCENSION P/L - LA 69 · $1,900.00 per EA · qty 2 · bid tab
  • 2026-01-14 · LaDOTD · LA 1: ASCENSION P/L - LA 69 · $1,500.00 per EA · qty 1 · bid tab
  • 2025-12-18 · LaDOTD · AREA C: DRAINAGE STRUCTURE REPLACEMENTS · $6,000.00 per EA · qty 3 · bid tab multi-county contract
  • 2025-08-13 · LaDOTD · LA 30: LA 74 - EBR P/L · $1,700.00 per EA · qty 1 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.

All Louisiana site-work prices by county · Louisiana coverage