Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| Asphalt pavement | TON | 9 | $123.00 | $102.00 to $275.00 | Bids- 2026-06-10 · LaDOTD · LA 82: 0.9 MI E N ISLAND RD - VERMILION · $275.00 per TON · qty 297.60 · bid tab
- 2026-06-10 · LaDOTD · LA 82: 0.9 MI E N ISLAND RD - VERMILION · $114.00 per TON · qty 3,947 · bid tab
- 2026-06-10 · LaDOTD · LA 82: 0.9 MI E N ISLAND RD - VERMILION · $146.00 per TON · qty 16,131.50 · bid tab
- 2025-02-12 · LaDOTD · LA 1143: LA 27 - MURIA RD · $123.00 per TON · qty 16,671.90 · bid tab
- 2025-02-12 · LaDOTD · LA 1143: LA 27 - MURIA RD · $102.00 per TON · qty 6,169 · bid tab
- 2025-02-12 · LaDOTD · LA 1143: LA 27 - MURIA RD · $195.00 per TON · qty 606.90 · bid tab
- 2024-07-10 · LaDOTD · LA 82: DYSON RD - 0.9 MI E OF N ISLAND RD · $148.00 per TON · qty 1,246.90 · bid tab
- 2024-07-10 · LaDOTD · LA 82: DYSON RD - 0.9 MI E OF N ISLAND RD · $120.00 per TON · qty 27,356.40 · bid tab
- 2024-07-10 · LaDOTD · LA 82: DYSON RD - 0.9 MI E OF N ISLAND RD · $112.00 per TON · qty 5,926 · bid tab
|
| Curb gutter | LF | 1 | n/a | n/a | Bids- 2026-06-10 · LaDOTD · LA 82: 0.9 MI E N ISLAND RD - VERMILION · $300.00 per LF · qty 50 · bid tab outlier, not in the median
|
| Excavation embankment | CY | 1 | n/a | n/a | Bids- 2026-06-10 · LaDOTD · LA 82: 0.9 MI E N ISLAND RD - VERMILION · $200.00 per CY · qty 19 · bid tab outlier, not in the median
|
Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.