Site-work prices, Caddo Parish, LA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across winning line items; outliers (below 20% or above 500% of the national median for the category and unit) are listed but left out of the median and range. Each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
Asphalt pavementTON28$200.00$145.00 to $575.00
Bids
  • 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $219.50 per TON · qty 828 · bid tab
  • 2026-08-12 · LaDOTD · LA 173: PINE ST TO HARTMAN ST · $179.35 per TON · qty 118.60 · bid tab
  • 2026-08-12 · LaDOTD · LA 173: PINE ST TO HARTMAN ST · $176.75 per TON · qty 1,998.90 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $325.00 per TON · qty 408.10 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $325.00 per TON · qty 408.10 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $375.00 per TON · qty 611.60 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $575.00 per TON · qty 48.50 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $575.00 per TON · qty 114.30 · bid tab
  • 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $153.00 per TON · qty 1,518.80 · bid tab
  • 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $145.50 per TON · qty 37,590.80 · bid tab
(10 most recent of 28 shown; all in the Hubstake feed)
Concrete pavementSY3$99.00$99.00 to $200.00
Bids
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $200.00 per SY · qty 975.40 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $99.00 per SY · qty 20,339.70 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $99.00 per SY · qty 4,134.60 · bid tab
Curb gutterLF9$20.00$12.00 to $120.00
Bids
  • 2026-08-12 · LaDOTD · LA 173: PINE ST TO HARTMAN ST · $100.00 per LF · qty 6,341 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $42.00 per LF · qty 1,476.60 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $12.00 per LF · qty 6,435.30 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $75.00 per LF · qty 11 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $12.00 per LF · qty 1,336.10 · bid tab
  • 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $20.00 per LF · qty 42 · bid tab
  • 2025-10-02 · LaDOTD · LA 511: Jewella Ave to US 171 · $19.50 per LF · qty 2,889.70 · bid tab
  • 2025-04-09 · LaDOTD · US 171: LA 3132 - US 80 · $15.00 per LF · qty 3,745 · bid tab
  • 2024-01-10 · LaDOTD · LA 173: LEFT TURN LANES AT RUSSELL ROAD · $120.00 per LF · qty 407.30 · bid tab
Excavation embankmentCY11$40.00$25.00 to $100.00
Bids
  • 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $40.00 per CY · qty 1,592 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $30.00 per CY · qty 1,592 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $120.00 per CY · qty 153 · bid tab outlier, not in the median
  • 2025-10-15 · LaDOTD · LA 525: SPRING RIDGE TO US 171 · $25.00 per CY · qty 1,508 · bid tab
  • 2025-07-09 · LaDOTD · DISTRICT 04 OVERLAYS: NORTHERN PARISHES · $100.00 per CY · qty 370.50 · bid tab multi-county contract
  • 2025-04-09 · LaDOTD · LA 530: LA 538 TO I-49 · $30.00 per CY · qty 2,245 · bid tab
  • 2025-04-09 · LaDOTD · US 171: LA 3132 - US 80 · $30.00 per CY · qty 923.80 · bid tab
  • 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $55.00 per CY · qty 390 · bid tab
  • 2024-07-10 · LaDOTD · LA 3049: BARTON DRIVE - WHITFIELD CIRCLE · $45.00 per CY · qty 3,853 · bid tab
  • 2024-01-10 · LaDOTD · LA 173: LEFT TURN LANES AT RUSSELL ROAD · $50.00 per CY · qty 987 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
Flexible baseCY1$190.00$190.00 to $190.00
Bids
  • 2025-05-14 · LaDOTD · CRAWFORD ROAD OVER TIGER BRANCH · $190.00 per CY · qty 215.80 · bid tab
Flexible baseSY5$49.00$32.00 to $125.00
Bids
  • 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $125.00 per SY · qty 751.80 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $150.00 per SY · qty 751.80 · bid tab outlier, not in the median
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $32.00 per SY · qty 4,442.30 · bid tab
  • 2025-12-10 · LaDOTD · LINWOOD AVENUE RECONSTRUCTION PHASE IV - A · $32.00 per SY · qty 21,493 · bid tab
  • 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $66.00 per SY · qty 2,561.90 · bid tab
Lime cement stabilizationSY5$26.25$16.80 to $45.00
Bids
  • 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $25.00 per SY · qty 752 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $45.00 per SY · qty 752 · bid tab
  • 2025-04-09 · LaDOTD · LA 530: LA 538 TO I-49 · $16.80 per SY · qty 39,274 · bid tab
  • 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $27.50 per SY · qty 2,562 · bid tab
  • 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $55.00 per SY · qty 995 · bid tab outlier, not in the median
Lime cement stabilizationTON4$475.00$80.00 to $825.00
Bids
  • 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $650.00 per TON · qty 10.66 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $80.00 per TON · qty 10.66 · bid tab
  • 2025-02-12 · LaDOTD · I-49: SB EXIT RAMP AT SOUTHERN LOOP · $825.00 per TON · qty 36.30 · bid tab
  • 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $300.00 per TON · qty 14.07 · bid tab
ManholeEA9$1,953.00$1,480.00 to $6,997.00
Bids
  • 2026-08-12 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $2,100.00 per EA · qty 6 · bid tab
  • 2026-06-24 · LaDOTD · I-20 DECEL LANE EXT EX 13 · $3,000.00 per EA · qty 6 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $1,953.00 per EA · qty 11 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $1,860.00 per EA · qty 3 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $6,997.00 per EA · qty 1 · bid tab
  • 2026-06-24 · LaDOTD · US 171: PED IMPROVEMENTS (SHREVEPORT) · $2,772.00 per EA · qty 1 · bid tab
  • 2024-11-13 · LaDOTD · LA 1: SOUTHFIELD ROAD TO STONER AVENUE · $1,550.00 per EA · qty 2 · bid tab
  • 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $1,480.00 per EA · qty 3 · bid tab
  • 2024-08-28 · LaDOTD · I-20: DECEL LANE EXT EX 8 · $1,535.00 per EA · qty 2 · bid tab

Source file sitework_prices.csv, sha256 2bb4664a6765. Engineer's estimates are excluded. Not a quote.