| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| Asphalt pavement | SY | 3 | n/a | n/a | Bids- 2026-05-19 · Iowa DOT · 71-0182-161 · $875.00 per SY · qty 6.50 · bid tab outlier, not in the median
- 2024-11-19 · Iowa DOT · 71-0598-035 · $148.00 per SY · qty 243.60 · bid tab outlier, not in the median
- 2024-11-19 · Iowa DOT · 71-0598-035 · $132.00 per SY · qty 295 · bid tab outlier, not in the median
|
| Asphalt pavement | TON | 4 | $153.00 | $87.44 to $220.00 | Bids- 2024-12-17 · Iowa DOT · 71-0182-139 · $87.44 per TON · qty 4,101.49 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $220.00 per TON · qty 60.08 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $153.00 per TON · qty 255.22 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $153.00 per TON · qty 482.21 · bid tab
|
| Concrete pavement | EA | 3 | $1.00 | $1.00 to $1.00 | Bids- 2024-01-17 · Iowa DOT · 71-C071-089 · $1.00 per EA · qty 12,865.26 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $1.00 per EA · qty 80,404.57 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $1.00 per EA · qty 56,439.56 · bid tab
|
| Concrete pavement | LS | 1 | $5,000.00 | $5,000.00 to $5,000.00 | Bids- 2024-12-17 · Iowa DOT · 71-0182-139 · $5,000.00 per LS · qty 1 · bid tab
|
| Concrete pavement | SY | 4 | $62.64 | $42.99 to $150.00 | Bids- 2024-12-17 · Iowa DOT · 71-0182-139 · $150.00 per SY · qty 2,612.70 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $82.23 per SY · qty 305.55 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $43.05 per SY · qty 15,139.88 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $42.99 per SY · qty 3,471.10 · bid tab
|
| Curb gutter | EA | 2 | n/a | n/a | Bids- 2025-12-16 · Iowa DOT · 71-0182-147 · $50.00 per EA · qty 2 · bid tab outlier, not in the median
- 2024-12-17 · Iowa DOT · 71-0182-139 · $107.00 per EA · qty 21 · bid tab outlier, not in the median
|
| Curb gutter | LF | 5 | $67.45 | $45.00 to $175.00 | Bids- 2026-05-19 · Iowa DOT · 71-0182-161 · $146.00 per LF · qty 39.50 · bid tab
- 2025-12-16 · Iowa DOT · 71-0182-147 · $50.00 per LF · qty 14 · bid tab
- 2025-12-16 · Iowa DOT · 71-0182-147 · $175.00 per LF · qty 52.20 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $67.45 per LF · qty 716 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $45.00 per LF · qty 105 · bid tab
|
| Excavation embankment | CY | 13 | $25.00 | $15.00 to $100.00 | Bids- 2025-04-15 · Iowa DOT · 72-0092-031 · $25.00 per CY · qty 25 · bid tab multi-county contract
- 2025-04-15 · Iowa DOT · 72-0092-031 · $20.00 per CY · qty 80 · bid tab multi-county contract
- 2025-03-18 · Iowa DOT · 71-0598-037 · $26.00 per CY · qty 58 · bid tab multi-county contract
- 2025-03-18 · Iowa DOT · 71-0598-037 · $26.00 per CY · qty 150 · bid tab multi-county contract
- 2025-03-18 · Iowa DOT · 71-0603-059 · $25.00 per CY · qty 110 · bid tab multi-county contract
- 2025-03-18 · Iowa DOT · 71-0603-059 · $22.00 per CY · qty 800 · bid tab multi-county contract
- 2025-03-18 · Iowa DOT · 71-0603-059 · $25.00 per CY · qty 260 · bid tab multi-county contract
- 2025-02-18 · Iowa DOT · 71-0102-048 · $15.00 per CY · qty 335 · bid tab
- 2025-02-18 · Iowa DOT · 84-0101-095 · $25.00 per CY · qty 200 · bid tab multi-county contract
- 2025-02-18 · Iowa DOT · 84-0101-095 · $25.00 per CY · qty 220 · bid tab multi-county contract
(10 most recent of 13 shown; all in the Hubstake feed) |
| Lime cement stabilization | ACRE | 3 | n/a | n/a | Bids- 2025-12-16 · Iowa DOT · 71-0182-147 · $15,000.00 per ACRE · qty 0.10 · bid tab outlier, not in the median
- 2024-12-17 · Iowa DOT · 71-0182-139 · $2,675.00 per ACRE · qty 0.70 · bid tab outlier, not in the median
- 2024-12-17 · Iowa DOT · 71-0182-139 · $2,675.00 per ACRE · qty 1.80 · bid tab outlier, not in the median
|
| Lime cement stabilization | SY | 1 | $5.00 | $5.00 to $5.00 | Bids- 2025-12-16 · Iowa DOT · 71-0182-152 · $5.00 per SY · qty 177.80 · bid tab
|
| Manhole | EA | 2 | $7,900.00 | $1,300.00 to $14,500.00 | Bids- 2026-07-21 · Iowa DOT · 71-0182-151 · $1,300.00 per EA · qty 5 · bid tab
- 2026-05-19 · Iowa DOT · 71-0182-161 · $14,500.00 per EA · qty 1 · bid tab
|
| Sidewalk | EA | 1 | $4,000.00 | $4,000.00 to $4,000.00 | Bids- 2026-05-19 · Iowa DOT · 71-0182-161 · $4,000.00 per EA · qty 1 · bid tab
|
| Sidewalk | SY | 11 | $117.75 | $85.60 to $225.00 | Bids- 2026-05-19 · Iowa DOT · 71-0182-161 · $185.00 per SY · qty 49.80 · bid tab
- 2026-05-19 · Iowa DOT · 71-0182-161 · $200.00 per SY · qty 25.40 · bid tab
- 2026-05-19 · Iowa DOT · 71-0182-161 · $190.00 per SY · qty 59.20 · bid tab
- 2025-12-16 · Iowa DOT · 71-0182-147 · $225.00 per SY · qty 77 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $85.60 per SY · qty 5,040.50 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $90.95 per SY · qty 1,122.50 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $117.75 per SY · qty 837.90 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $107.00 per SY · qty 682 · bid tab
- 2024-12-17 · Iowa DOT · 71-0182-139 · $128.50 per SY · qty 277.70 · bid tab
- 2024-01-17 · Iowa DOT · 71-C071-089 · $86.21 per SY · qty 450 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed) |
| Storm pipe 15-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2026-05-19 · Iowa DOT · 71-0182-161 · $150.00 per LF · qty 15 · bid tab
|
| Storm pipe 18-inch | LF | 1 | $93.55 | $93.55 to $93.55 | Bids- 2024-12-17 · Iowa DOT · 71-0182-139 · $93.55 per LF · qty 78 · bid tab
|
| Water service | EA | 1 | n/a | n/a | Bids- 2024-12-17 · Iowa DOT · 71-0182-139 · $268.00 per EA · qty 12 · bid tab outlier, not in the median
|