PadstakeGet the fee reports
Menu

Site-work prices, Johnson County, WY

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON21$515.00$54.50 to $1,665.00
Bids
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $55.01 per TON · qty 27525.0 · bid tab
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $1,155.00 per TON · qty 52.0 · bid tab
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $524.70 per TON · qty 1290.0 · bid tab
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $834.75 per TON · qty 278.0 · bid tab
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $110.68 per TON · qty 1140.0 · bid tab
  • 2025-12-11 · WYDOT · Middle Fork Powder River (County Rd 78) · $305.00 per TON · qty 348.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $1,665.00 per TON · qty 53.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $61.20 per TON · qty 37500.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $54.50 per TON · qty 2340.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $700.00 per TON · qty 1845.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed)
curb gutterFT5$75.00$5.78 to $176.00
Bids
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $5.78 per FT · qty 13535.0 · bid tab
  • 2024-08-08 · WYDOT · Buffalo MSE Retaining Wall Repair · $22.00 per FT · qty 350.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $176.00 per FT · qty 75.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $115.00 per FT · qty 2045.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $75.00 per FT · qty 900.0 · bid tab
excavation embankmentCY9$13.30$8.50 to $230.00
Bids
  • 2026-05-14 · WYDOT · Sussex - Linch (WYO 192) · $10.00 per CY · qty 16400.0 · bid tab
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $9.00 per CY · qty 47125.0 · bid tab
  • 2025-12-11 · WYDOT · Middle Fork Powder River (County Rd 78) · $20.00 per CY · qty 650.0 · bid tab
  • 2025-12-11 · WYDOT · Middle Fork Powder River (County Rd 78) · $8.50 per CY · qty 1540.0 · bid tab
  • 2025-04-10 · WYDOT · Buffalo South · $22.30 per CY · qty 8300.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $13.30 per CY · qty 168000.0 · bid tab
  • 2024-08-08 · WYDOT · Buffalo MSE Retaining Wall Repair · $27.00 per CY · qty 1822.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $13.00 per CY · qty 4500.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $230.00 per CY · qty 155.0 · bid tab
inlet headwallCY1$3,225.00$3,225.00 to $3,225.00
Bids
  • 2026-05-14 · WYDOT · Sussex - Linch (WYO 192) · $3,225.00 per CY · qty 20.0 · bid tab
inlet headwallEA3$6,500.00$2,250.00 to $9,125.00
Bids
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $2,250.00 per EA · qty 6.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $9,125.00 per EA · qty 4.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $6,500.00 per EA · qty 30.0 · bid tab
lime cement stabilizationTON5$250.00$189.00 to $280.00
Bids
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $189.00 per TON · qty 227.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $280.00 per TON · qty 315.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $250.00 per TON · qty 250.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $250.00 per TON · qty 40.0 · bid tab
  • 2024-01-11 · WYDOT · Buffalo - Ucross (Buffalo North) · $245.00 per TON · qty 104.0 · bid tab
manholeEA5$11,150.00$475.00 to $43,095.00
Bids
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $43,095.00 per EA · qty 1.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $36,250.00 per EA · qty 1.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $475.00 per EA · qty 6.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $11,150.00 per EA · qty 2.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $1,450.00 per EA · qty 2.0 · bid tab
sidewalkSY2$180.00$170.00 to $190.00
Bids
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $170.00 per SY · qty 220.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $190.00 per SY · qty 1990.0 · bid tab
storm pipe 18-inchFT2$135.50$125.00 to $146.00
Bids
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $125.00 per FT · qty 664.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $146.00 per FT · qty 452.0 · bid tab
storm pipe 24-inchFT3$160.00$78.75 to $300.00
Bids
  • 2025-12-11 · WYDOT · Buffalo - Ten Sleep (US 16) · $78.75 per FT · qty 698.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $160.00 per FT · qty 34.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $300.00 per FT · qty 76.0 · bid tab
storm pipe 30-inchFT2$640.00$400.00 to $880.00
Bids
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $400.00 per FT · qty 10.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $880.00 per FT · qty 8.0 · bid tab
storm pipe 48-inchFT1$560.00$560.00 to $560.00
Bids
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $560.00 per FT · qty 53.0 · bid tab
storm pipe 54-inchFT1$665.00$665.00 to $665.00
Bids
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $665.00 per FT · qty 316.0 · bid tab
storm pipe 72-inchFT1$1,000.00$1,000.00 to $1,000.00
Bids
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $1,000.00 per FT · qty 16.0 · bid tab
storm pipe 84-inchFT2$760.00$550.00 to $970.00
Bids
  • 2026-05-14 · WYDOT · Sussex - Linch (WYO 192) · $550.00 per FT · qty 30.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $970.00 per FT · qty 144.0 · bid tab
storm pipe 8-inchFT1$97.00$97.00 to $97.00
Bids
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $97.00 per FT · qty 4.0 · bid tab
storm pipe (diameter not stated)FT3$2,680.00$1,319.00 to $3,875.00
Bids
  • 2025-04-10 · WYDOT · Buffalo South · $1,319.00 per FT · qty 86.0 · bid tab
  • 2024-11-14 · WYDOT · Casper - Kaycee (TTT Section - SBL) · $2,680.00 per FT · qty 34.0 · bid tab
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $3,875.00 per FT · qty 186.0 · bid tab
water serviceEA1$3,050.00$3,050.00 to $3,050.00
Bids
  • 2024-04-11 · WYDOT · Buffalo Streets / Main Street · $3,050.00 per EA · qty 21.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.