Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY1$77.92$77.92 to $77.92
Bids
  • 2023-12-12 · WisDOT · 20231212032 · $77.92 per SY · qty 82.0 · bid tab
asphalt pavementTON4$82.37$71.39 to $142.29
Bids
  • 2026-01-13 · WisDOT · 20260113042 · $142.29 per TON · qty 854.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $71.39 per TON · qty 1000.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $88.23 per TON · qty 36516.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $76.50 per TON · qty 43411.0 · bid tab
concrete pavementDOL1$1.00$1.00 to $1.00
Bids
  • 2026-01-13 · WisDOT · 20260113042 · $1.00 per DOL · qty 500.0 · bid tab
concrete pavementSY1$309.71$309.71 to $309.71
Bids
  • 2026-01-13 · WisDOT · 20260113042 · $309.71 per SY · qty 80.0 · bid tab
curb gutterLF5$31.60$0.30 to $76.51
Bids
  • 2026-01-13 · WisDOT · 20260113042 · $65.31 per LF · qty 53.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $76.51 per LF · qty 2886.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $31.60 per LF · qty 993.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $0.30 per LF · qty 3879.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $0.80 per LF · qty 3879.0 · bid tab
excavation embankmentCY4$19.22$10.40 to $35.00
Bids
  • 2026-01-13 · WisDOT · 20260113042 · $10.40 per CY · qty 2027.0 · bid tab
  • 2026-01-13 · WisDOT · 20260113042 · $18.50 per CY · qty 4544.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $19.94 per CY · qty 5811.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $35.00 per CY · qty 85.0 · bid tab
inlet headwallEACH1$3,000.00$3,000.00 to $3,000.00
Bids
  • 2023-12-12 · WisDOT · 20231212032 · $3,000.00 per EACH · qty 1.0 · bid tab
sidewalkEACH3$100.78$100.00 to $110.00
Bids
  • 2023-12-12 · WisDOT · 20231212032 · $100.00 per EACH · qty 1.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $110.00 per EACH · qty 19.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $100.78 per EACH · qty 1.0 · bid tab
sidewalkSF5$19.05$0.07 to $75.00
Bids
  • 2023-12-12 · WisDOT · 20231212032 · $19.05 per SF · qty 365.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $0.07 per SF · qty 4386.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $18.06 per SF · qty 4021.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $75.00 per SF · qty 55.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $66.00 per SF · qty 180.0 · bid tab
sidewalkSY2$49.37$0.60 to $98.14
Bids
  • 2023-12-12 · WisDOT · 20231212032 · $98.14 per SY · qty 77.0 · bid tab
  • 2023-12-12 · WisDOT · 20231212032 · $0.60 per SY · qty 77.0 · bid tab