| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 3 | $39.80 | $4.47 to $42.00 | Bids- 2025-05-13 · WisDOT · 20250513030 · $39.80 per SY · qty 100.0 · bid tab
- 2024-11-12 · WisDOT · 20241112033 · $4.47 per SY · qty 66780.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $42.00 per SY · qty 57.0 · bid tab
|
| asphalt pavement | TON | 15 | $78.00 | $0.01 to $325.00 | Bids- 2026-08-11 · WisDOT · 20260811016 · $74.90 per TON · qty 4490.0 · bid tab
- 2026-01-13 · WisDOT · 20260113028 · $189.20 per TON · qty 148.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $229.80 per TON · qty 57.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $60.40 per TON · qty 18000.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $112.45 per TON · qty 246.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $71.10 per TON · qty 15500.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $67.90 per TON · qty 4300.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $0.01 per TON · qty 4950.0 · bid tab
- 2024-11-12 · WisDOT · 20241112033 · $156.55 per TON · qty 300.0 · bid tab
- 2024-11-12 · WisDOT · 20241112033 · $78.00 per TON · qty 4875.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed) |
| concrete pavement | DOL | 1 | $1.00 | $1.00 to $1.00 | Bids- 2024-01-09 · WisDOT · 20240109019 · $1.00 per DOL · qty 1101.0 · bid tab
|
| concrete pavement | LF | 1 | $1.20 | $1.20 to $1.20 | Bids- 2024-01-09 · WisDOT · 20240109019 · $1.20 per LF · qty 2420.0 · bid tab
|
| concrete pavement | SY | 1 | $76.00 | $76.00 to $76.00 | Bids- 2024-01-09 · WisDOT · 20240109019 · $76.00 per SY · qty 3670.0 · bid tab
|
| curb gutter | LF | 13 | $50.00 | $0.65 to $82.20 | Bids- 2026-01-13 · WisDOT · 20260113028 · $1.50 per LF · qty 198.0 · bid tab
- 2026-01-13 · WisDOT · 20260113028 · $50.00 per LF · qty 198.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $77.60 per LF · qty 24.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $82.20 per LF · qty 154.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $6.00 per LF · qty 323.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $53.67 per LF · qty 71.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $81.00 per LF · qty 1678.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $0.65 per LF · qty 1678.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $81.00 per LF · qty 117.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $6.75 per LF · qty 200.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| excavation embankment | CY | 5 | $21.04 | $15.90 to $38.00 | Bids- 2026-08-11 · WisDOT · 20260811016 · $30.32 per CY · qty 1910.0 · bid tab
- 2026-01-13 · WisDOT · 20260113028 · $38.00 per CY · qty 306.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $21.04 per CY · qty 251.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $15.90 per CY · qty 3502.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $20.20 per CY · qty 646.0 · bid tab
|
| inlet headwall | EACH | 1 | $1,000.00 | $1,000.00 to $1,000.00 | Bids- 2026-01-13 · WisDOT · 20260113028 · $1,000.00 per EACH · qty 2.0 · bid tab
|
| lime cement stabilization | ACRE | 1 | $3,000.00 | $3,000.00 to $3,000.00 | Bids- 2024-01-09 · WisDOT · 20240109019 · $3,000.00 per ACRE · qty 1.64 · bid tab
|
| manhole | EACH | 2 | $3,506.50 | $565.00 to $6,448.00 | Bids- 2025-05-13 · WisDOT · 20250513030 · $6,448.00 per EACH · qty 1.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $565.00 per EACH · qty 1.0 · bid tab
|
| sidewalk | EACH | 4 | $200.00 | $10.00 to $1,300.00 | Bids- 2026-01-13 · WisDOT · 20260113028 · $1,300.00 per EACH · qty 1.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $10.00 per EACH · qty 1.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $250.00 per EACH · qty 12.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $150.00 per EACH · qty 30.0 · bid tab
|
| sidewalk | SF | 7 | $31.77 | $9.00 to $59.94 | Bids- 2026-01-13 · WisDOT · 20260113028 · $9.00 per SF · qty 1040.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $59.94 per SF · qty 24.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $31.77 per SF · qty 250.0 · bid tab
- 2025-08-12 · WisDOT · 20250812017 · $12.19 per SF · qty 2580.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $9.25 per SF · qty 5459.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $58.00 per SF · qty 109.0 · bid tab
- 2025-05-13 · WisDOT · 20250513030 · $35.00 per SF · qty 330.0 · bid tab
|
| sidewalk | SY | 1 | $90.00 | $90.00 to $90.00 | Bids- 2026-01-13 · WisDOT · 20260113028 · $90.00 per SY · qty 35.0 · bid tab
|
| storm pipe 12-inch | LF | 2 | $87.10 | $80.75 to $93.45 | Bids- 2026-08-11 · WisDOT · 20260811016 · $80.75 per LF · qty 194.0 · bid tab
- 2026-01-13 · WisDOT · 20260113028 · $93.45 per LF · qty 51.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $94.50 | $94.50 to $94.50 | Bids- 2026-08-11 · WisDOT · 20260811016 · $94.50 per LF · qty 158.0 · bid tab
|
| storm pipe 18-inch | LF | 5 | $119.25 | $61.80 to $161.50 | Bids- 2026-08-11 · WisDOT · 20260811016 · $105.50 per LF · qty 26.0 · bid tab
- 2026-08-11 · WisDOT · 20260811016 · $161.50 per LF · qty 32.0 · bid tab
- 2026-01-13 · WisDOT · 20260113028 · $119.25 per LF · qty 40.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $61.80 per LF · qty 86.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $149.70 per LF · qty 12.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $172.60 | $123.20 to $222.00 | Bids- 2025-05-13 · WisDOT · 20250513030 · $222.00 per LF · qty 8.0 · bid tab
- 2024-01-09 · WisDOT · 20240109019 · $123.20 per LF · qty 16.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $259.25 | $259.25 to $259.25 | Bids- 2026-08-11 · WisDOT · 20260811016 · $259.25 per LF · qty 104.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $207.40 | $207.40 to $207.40 | Bids- 2024-01-09 · WisDOT · 20240109019 · $207.40 per LF · qty 84.0 · bid tab
|
| storm pipe 38-inch | LF | 1 | $308.75 | $308.75 to $308.75 | Bids- 2026-08-11 · WisDOT · 20260811016 · $308.75 per LF · qty 72.0 · bid tab
|