Site-work prices, Chippewa County, WI
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | SY | 5 | $46.20 | $3.60 to $75.00 | Bids
|
| asphalt pavement | TON | 35 | $142.04 | $3.77 to $826.00 | Bids
|
| concrete pavement | DOL | 6 | $1.00 | $1.00 to $1.00 | Bids
|
| concrete pavement | LF | 3 | $1.00 | $0.57 to $2.30 | |
| concrete pavement | SY | 16 | $98.95 | $5.01 to $288.00 | Bids
|
| curb gutter | LF | 44 | $38.56 | $0.30 to $100.01 | Bids
|
| excavation embankment | CY | 26 | $22.66 | $7.23 to $65.00 | Bids
|
| inlet headwall | EACH | 12 | $975.00 | $195.00 to $1,568.40 | Bids
|
| lime cement stabilization | SF | 2 | $107.94 | $106.64 to $109.24 | |
| sidewalk | EACH | 9 | $100.00 | $10.00 to $792.05 | Bids
|
| sidewalk | SF | 16 | $14.48 | $0.07 to $76.65 | Bids
|
| sidewalk | SY | 4 | $85.68 | $67.11 to $98.73 | |
| storm pipe 12-inch | LF | 7 | $68.50 | $50.00 to $250.39 | Bids
|
| storm pipe 18-inch | LF | 7 | $74.00 | $63.00 to $394.48 | Bids
|
| storm pipe 21-inch | LF | 1 | $131.91 | $131.91 to $131.91 | Bids
|
| storm pipe 24-inch | LF | 7 | $119.00 | $94.00 to $383.25 | Bids
|
| storm pipe 30-inch | LF | 7 | $220.00 | $113.85 to $340.00 | Bids
|
| storm pipe 36-inch | LF | 1 | $84.00 | $84.00 to $84.00 | Bids
|
| storm pipe 38-inch | LF | 1 | $251.00 | $251.00 to $251.00 | Bids
|
| storm pipe 48-inch | LF | 2 | $356.93 | $113.85 to $600.00 | |
| storm pipe (diameter not stated) | LF | 1 | $35.00 | $35.00 to $35.00 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.