Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON19$250.00$122.00 to $3,850.00
Bids
  • 2026-06-17 · WSDOT · XE3729 · $650.00 per TON · qty 5.0 · bid tab
  • 2026-03-04 · WSDOT · XE3701 · $482.00 per TON · qty 36.0 · bid tab
  • 2026-03-04 · WSDOT · XE3701 · $455.00 per TON · qty 235.5 · bid tab
  • 2026-03-04 · WSDOT · XE3701 · $157.00 per TON · qty 5885.1 · bid tab
  • 2025-12-03 · WSDOT · XE3668 · $397.00 per TON · qty 30.0 · bid tab
  • 2025-05-21 · WSDOT · XE3627 · $145.00 per TON · qty 7340.0 · bid tab
  • 2025-05-21 · WSDOT · XE3627 · $270.00 per TON · qty 570.0 · bid tab
  • 2025-05-07 · WSDOT · XE3621 · $300.00 per TON · qty 185.0 · bid tab
  • 2025-05-07 · WSDOT · XE3621 · $122.00 per TON · qty 12660.0 · bid tab
  • 2025-04-09 · WSDOT · XE3605 · $138.00 per TON · qty 5664.0 · bid tab
(10 most recent of 19 shown; all in the Hubstake feed)
concrete pavementS.Y.1$21.75$21.75 to $21.75
Bids
  • 2025-05-29 · WSDOT · XE3633 · $21.75 per S.Y. · qty 48350.0 · bid tab
curb gutterL.F.10$82.50$25.80 to $225.00
Bids
  • 2026-06-17 · WSDOT · XE3729 · $225.00 per L.F. · qty 15.0 · bid tab
  • 2026-06-17 · WSDOT · XE3729 · $90.00 per L.F. · qty 150.0 · bid tab
  • 2025-03-19 · WSDOT · XE3594 · $72.25 per L.F. · qty 37.0 · bid tab
  • 2025-03-19 · WSDOT · XE3594 · $25.80 per L.F. · qty 537.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $195.00 per L.F. · qty 535.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $62.00 per L.F. · qty 15.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $62.00 per L.F. · qty 83.0 · bid tab
  • 2024-03-13 · WSDOT · XE3505 · $81.00 per L.F. · qty 82.0 · bid tab
  • 2024-03-13 · WSDOT · XE3505 · $84.00 per L.F. · qty 173.0 · bid tab
  • 2024-02-22 · WSDOT · XE3499 · $105.00 per L.F. · qty 4.0 · bid tab
fire hydrantEACH1$8,150.00$8,150.00 to $8,150.00
Bids
  • 2025-03-19 · WSDOT · XE3594 · $8,150.00 per EACH · qty 1.0 · bid tab
flexible baseC.Y.1$400.00$400.00 to $400.00
Bids
  • 2024-02-22 · WSDOT · XE3499 · $400.00 per C.Y. · qty 3.0 · bid tab
flexible baseTON7$75.00$45.00 to $305.00
Bids
  • 2026-02-19 · WSDOT · XE3697 · $97.09 per TON · qty 9.0 · bid tab
  • 2025-05-21 · WSDOT · XE3627 · $240.00 per TON · qty 120.0 · bid tab
  • 2025-04-09 · WSDOT · XE3605 · $72.00 per TON · qty 175.0 · bid tab
  • 2025-03-19 · WSDOT · XE3594 · $45.00 per TON · qty 840.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $75.00 per TON · qty 460.0 · bid tab
  • 2024-03-13 · WSDOT · XE3505 · $305.00 per TON · qty 8.0 · bid tab
  • 2024-01-10 · WSDOT · XE3422 · $50.00 per TON · qty 91.0 · bid tab
inlet headwallEACH1$4,525.00$4,525.00 to $4,525.00
Bids
  • 2025-03-19 · WSDOT · XE3594 · $4,525.00 per EACH · qty 3.0 · bid tab
lime cement stabilizationS.Y.1$35.25$35.25 to $35.25
Bids
  • 2025-03-19 · WSDOT · XE3594 · $35.25 per S.Y. · qty 223.0 · bid tab
manholeEACH2$7,450.00$4,650.00 to $10,250.00
Bids
  • 2025-03-19 · WSDOT · XE3594 · $4,650.00 per EACH · qty 6.0 · bid tab
  • 2025-03-19 · WSDOT · XE3594 · $10,250.00 per EACH · qty 1.0 · bid tab
sidewalkEACH7$11,000.00$8,000.00 to $26,000.00
Bids
  • 2024-09-05 · WSDOT · XE3553 · $8,000.00 per EACH · qty 12.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $8,700.00 per EACH · qty 2.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $8,000.00 per EACH · qty 16.0 · bid tab
  • 2024-09-05 · WSDOT · XE3553 · $11,000.00 per EACH · qty 5.0 · bid tab
  • 2024-03-13 · WSDOT · XE3505 · $26,000.00 per EACH · qty 2.0 · bid tab
  • 2024-03-13 · WSDOT · XE3505 · $26,000.00 per EACH · qty 1.0 · bid tab
  • 2024-03-13 · WSDOT · XE3505 · $26,000.00 per EACH · qty 3.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.