Site-work prices, Wythe County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON17$168.00$121.11 to $475.00
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $267.20 per TON · qty 1288.0 · bid tab
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $235.61 per TON · qty 1092.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $215.60 per TON · qty 350.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $254.90 per TON · qty 435.0 · bid tab
  • 2025-11-19 · VDOT (Bristol (1)) · C0000124819B65 · $335.00 per TON · qty 1037.0 · bid tab
  • 2025-11-19 · VDOT (Bristol (1)) · C0000124819B65 · $365.00 per TON · qty 1121.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000121247B72 · $475.00 per TON · qty 306.0 · bid tab
  • 2024-10-23 · VDOT (Bristol (1)) · C0000119435C01 · $130.00 per TON · qty 8323.0 · bid tab
  • 2024-10-23 · VDOT (Bristol (1)) · C0000119435C01 · $168.00 per TON · qty 5133.0 · bid tab
  • 2024-10-23 · VDOT (Bristol (1)) · C0000119435C01 · $160.00 per TON · qty 2133.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
curb gutterLF8$81.20$25.00 to $279.48
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $81.27 per LF · qty 57.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $183.90 per LF · qty 50.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $81.20 per LF · qty 335.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $81.20 per LF · qty 240.0 · bid tab
  • 2024-08-28 · VDOT (Bristol (1)) · C0000116166C01 · $279.48 per LF · qty 127.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $42.00 per LF · qty 1257.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $25.00 per LF · qty 12826.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $44.50 per LF · qty 497.0 · bid tab
curb gutterTON1$254.00$254.00 to $254.00
Bids
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $254.00 per TON · qty 530.0 · bid tab
excavation embankmentCY2$48.19$1.00 to $95.37
Bids
  • 2024-08-28 · VDOT (Bristol (1)) · C0000116166C01 · $95.37 per CY · qty 504.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $1.00 per CY · qty 320414.0 · bid tab
excavation embankmentSY1$3.50$3.50 to $3.50
Bids
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $3.50 per SY · qty 9214.0 · bid tab
fire hydrantEA2$7,418.57$7,300.00 to $7,537.14
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $7,537.14 per EA · qty 1.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $7,300.00 per EA · qty 2.0 · bid tab
inlet headwallEA36$7,858.84$4,977.20 to $14,484.39
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $8,085.24 per EA · qty 3.0 · bid tab
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $9,614.65 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $8,806.79 per EA · qty 6.0 · bid tab
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $7,443.92 per EA · qty 2.0 · bid tab
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $7,917.68 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $9,067.60 per EA · qty 4.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $11,254.10 per EA · qty 2.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $4,977.20 per EA · qty 1.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $9,352.00 per EA · qty 2.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $10,620.00 per EA · qty 1.0 · bid tab
(10 most recent of 36 shown; all in the Hubstake feed)
lime cement stabilizationSY1$2.75$2.75 to $2.75
Bids
  • 2024-10-23 · VDOT (Bristol (1)) · C0000119435C01 · $2.75 per SY · qty 10555.0 · bid tab
lime cement stabilizationTON5$151.48$139.00 to $207.64
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $207.64 per TON · qty 11.44 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $190.21 per TON · qty 3.86 · bid tab
  • 2024-10-23 · VDOT (Bristol (1)) · C0000119435C01 · $139.00 per TON · qty 101.0 · bid tab
  • 2024-08-28 · VDOT (Bristol (1)) · C0000116166C01 · $151.48 per TON · qty 11.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $150.00 per TON · qty 63.21 · bid tab
manholeEA2$2,400.00$2,300.00 to $2,500.00
Bids
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $2,500.00 per EA · qty 1.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $2,300.00 per EA · qty 9.0 · bid tab
sewer main 8-inchLF1$731.98$731.98 to $731.98
Bids
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $731.98 per LF · qty 74.0 · bid tab
sewer serviceLF1$285.69$285.69 to $285.69
Bids
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $285.69 per LF · qty 25.0 · bid tab
sidewalkSY1$402.60$402.60 to $402.60
Bids
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $402.60 per SY · qty 140.0 · bid tab
storm pipe 12-inchLF1$83.00$83.00 to $83.00
Bids
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $83.00 per LF · qty 21.0 · bid tab
storm pipe 15-inchLF3$197.95$90.00 to $383.00
Bids
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $383.00 per LF · qty 24.0 · bid tab
  • 2024-08-28 · VDOT (Bristol (1)) · C0000116166C01 · $197.95 per LF · qty 72.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $90.00 per LF · qty 15.0 · bid tab
storm pipe 18-inchLF3$178.10$103.00 to $243.20
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $178.10 per LF · qty 470.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $243.20 per LF · qty 266.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $103.00 per LF · qty 3558.0 · bid tab
storm pipe 24-inchLF2$178.00$127.00 to $229.00
Bids
  • 2024-10-23 · VDOT (Bristol (1)) · C0000119435C01 · $229.00 per LF · qty 270.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $127.00 per LF · qty 1020.0 · bid tab
storm pipe 30-inchLF1$169.00$169.00 to $169.00
Bids
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $169.00 per LF · qty 296.0 · bid tab
storm pipe 36-inchLF1$245.00$245.00 to $245.00
Bids
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $245.00 per LF · qty 47.0 · bid tab
water main 12-inchLF2$352.06$247.00 to $457.11
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $457.11 per LF · qty 442.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $247.00 per LF · qty 159.0 · bid tab
water main 6-inchLF2$249.67$170.00 to $329.34
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $329.34 per LF · qty 13.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $170.00 per LF · qty 101.0 · bid tab
water main 8-inchLF1$408.13$408.13 to $408.13
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $408.13 per LF · qty 76.0 · bid tab
water serviceLF4$99.00$37.54 to $280.58
Bids
  • 2026-07-22 · VDOT (Bristol (1)) · C0000119436C01 · $37.54 per LF · qty 111.0 · bid tab
  • 2026-02-25 · VDOT (Bristol (1)) · C0000119431C01B · $280.58 per LF · qty 165.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $47.00 per LF · qty 74.0 · bid tab
  • 2023-11-15 · VDOT (Bristol (1)) · C000116164C01 · $151.00 per LF · qty 25.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.