PadstakeGet the fee reports
Menu

Site-work prices, Wise County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON6$177.15$141.75 to $825.00
Bids
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $182.00 per TON · qty 3349.0 · bid tab
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $152.00 per TON · qty 3161.0 · bid tab
  • 2026-02-04 · VDOT (Bristol (1)) · C0000123319B54 · $825.00 per TON · qty 9.0 · bid tab
  • 2026-02-04 · VDOT (Bristol (1)) · C0000123319B54 · $460.00 per TON · qty 181.0 · bid tab
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $141.75 per TON · qty 1594.0 · bid tab
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $172.30 per TON · qty 2569.0 · bid tab
curb gutterLF3$60.00$60.00 to $150.00
Bids
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $60.00 per LF · qty 110.0 · bid tab
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $60.00 per LF · qty 318.0 · bid tab
  • 2026-02-04 · VDOT (Bristol (1)) · C0000123319B54 · $150.00 per LF · qty 405.0 · bid tab
curb gutterTON1$500.00$500.00 to $500.00
Bids
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $500.00 per TON · qty 15.0 · bid tab
excavation embankmentCY1$45.00$45.00 to $45.00
Bids
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $45.00 per CY · qty 3498.0 · bid tab
inlet headwallEA7$8,300.00$7,500.00 to $14,000.00
Bids
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $8,200.00 per EA · qty 1.0 · bid tab
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $7,700.00 per EA · qty 7.0 · bid tab
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $7,500.00 per EA · qty 1.0 · bid tab
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $14,000.00 per EA · qty 1.0 · bid tab
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $8,300.00 per EA · qty 3.0 · bid tab
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $12,000.00 per EA · qty 1.0 · bid tab
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $13,000.00 per EA · qty 10.0 · bid tab
lime cement stabilizationTON2$184.00$168.00 to $200.00
Bids
  • 2026-04-22 · VDOT (Bristol (1)) · C0000117109B54 · $200.00 per TON · qty 19.38 · bid tab
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $168.00 per TON · qty 12.37 · bid tab
storm pipe 18-inchLF1$337.00$337.00 to $337.00
Bids
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $337.00 per LF · qty 448.0 · bid tab
water main 4-inchLF1$200.00$200.00 to $200.00
Bids
  • 2024-11-20 · VDOT (Bristol (1)) · C0000119434C01 · $200.00 per LF · qty 35.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.