Site-work prices, Southampton County, VA
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| excavation embankment | CY | 1 | $17.00 | $17.00 to $17.00 | Bids
|
| lime cement stabilization | TON | 1 | $340.00 | $340.00 to $340.00 | Bids
|
| storm pipe (diameter not stated) | LF | 1 | $3,120.00 | $3,120.00 to $3,120.00 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.