Site-work prices, Smyth County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON10$227.50$136.00 to $800.00
Bids
  • 2026-03-25 · VDOT (Bristol (1)) · C0000121244B67 · $800.00 per TON · qty 297.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $230.00 per TON · qty 161.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $195.00 per TON · qty 252.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $230.00 per TON · qty 329.0 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $750.00 per TON · qty 25.0 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $360.00 per TON · qty 266.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $145.00 per TON · qty 298.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $185.00 per TON · qty 418.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $136.00 per TON · qty 1013.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000119444C01 · $225.00 per TON · qty 651.0 · bid tab
curb gutterLF12$115.50$90.00 to $130.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $130.00 per LF · qty 284.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $121.00 per LF · qty 524.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $121.00 per LF · qty 151.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $121.00 per LF · qty 270.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $130.00 per LF · qty 574.0 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $90.00 per LF · qty 63.3 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $100.00 per LF · qty 58.5 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $110.00 per LF · qty 77.2 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $121.00 per LF · qty 858.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $110.00 per LF · qty 163.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
excavation embankmentCY4$42.50$30.00 to $50.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $50.00 per CY · qty 965.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $50.00 per CY · qty 6690.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $30.00 per CY · qty 8627.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $35.00 per CY · qty 1080.0 · bid tab
inlet headwallEA11$8,000.00$6,000.00 to $8,000.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 3.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 2.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 2.0 · bid tab
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $8,000.00 per EA · qty 1.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $7,000.00 per EA · qty 1.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $7,000.00 per EA · qty 1.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $7,000.00 per EA · qty 3.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
lime cement stabilizationTON2$275.00$200.00 to $350.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $200.00 per TON · qty 11.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $350.00 per TON · qty 13.2 · bid tab
manholeEA3$5,000.00$2,800.00 to $5,762.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $2,800.00 per EA · qty 1.0 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $5,762.00 per EA · qty 3.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $5,000.00 per EA · qty 1.0 · bid tab
sidewalkSY2$317.50$135.00 to $500.00
Bids
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $135.00 per SY · qty 129.0 · bid tab
  • 2024-03-27 · VDOT (Bristol (1)) · C000110798C01B · $500.00 per SY · qty 10.0 · bid tab
storm pipe 18-inchLF2$125.00$125.00 to $125.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $125.00 per LF · qty 782.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $125.00 per LF · qty 795.0 · bid tab
water main 6-inchLF2$185.00$150.00 to $220.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $150.00 per LF · qty 492.0 · bid tab
  • 2024-01-17 · VDOT (Bristol (1)) · C0000115485C01 · $220.00 per LF · qty 249.0 · bid tab
water serviceLF1$90.00$90.00 to $90.00
Bids
  • 2025-12-17 · VDOT (Bristol (1)) · C0000119429C01 · $90.00 per LF · qty 67.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.