| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 5 | $250.00 | $126.75 to $301.61 | Bids- 2026-04-22 · VDOT (Bristol (1)) · C0000125211N01 · $301.61 per TON · qty 50.0 · bid tab
- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $300.00 per TON · qty 147.0 · bid tab
- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $250.00 per TON · qty 339.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $147.25 per TON · qty 1585.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $126.75 per TON · qty 1765.0 · bid tab
|
| curb gutter | LF | 4 | $85.22 | $63.65 to $99.00 | Bids- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $99.00 per LF · qty 135.0 · bid tab
- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $99.00 per LF · qty 71.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $63.65 per LF · qty 187.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $71.45 per LF · qty 111.0 · bid tab
|
| inlet headwall | EA | 8 | $7,424.76 | $2,500.00 to $12,776.39 | Bids- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $9,000.00 per EA · qty 1.0 · bid tab
- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $5,000.00 per EA · qty 1.0 · bid tab
- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $9,000.00 per EA · qty 1.0 · bid tab
- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $9,000.00 per EA · qty 1.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $5,849.53 per EA · qty 2.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $5,666.61 per EA · qty 1.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $12,776.39 per EA · qty 3.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $2,500.00 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | TON | 2 | $265.00 | $180.00 to $350.00 | Bids- 2025-05-28 · VDOT (Bristol (1)) · C0000120637C01 · $350.00 per TON · qty 11.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $180.00 per TON · qty 11.0 · bid tab
|
| manhole | EA | 3 | $3,037.06 | $2,717.16 to $3,105.76 | Bids- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $2,717.16 per EA · qty 1.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $3,037.06 per EA · qty 1.0 · bid tab
- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $3,105.76 per EA · qty 1.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $113.95 | $113.95 to $113.95 | Bids- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $113.95 per LF · qty 34.0 · bid tab
|
| water main 8-inch | LF | 1 | $186.57 | $186.57 to $186.57 | Bids- 2024-11-20 · VDOT (Bristol (1)) · C0000119439C01 · $186.57 per LF · qty 207.0 · bid tab
|