| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 6 | $385.13 | $228.34 to $1,300.00 | Bids- 2025-12-17 · VDOT (Salem (2)) · C0000119474C01 · $228.34 per TON · qty 315.0 · bid tab
- 2025-12-17 · VDOT (Salem (2)) · C0000119474C01 · $460.27 per TON · qty 101.0 · bid tab
- 2025-12-17 · VDOT (Salem (2)) · C0000119474C01 · $239.73 per TON · qty 88.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $310.00 per TON · qty 489.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $1,300.00 per TON · qty 1.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $1,300.00 per TON · qty 1.0 · bid tab
|
| curb gutter | LF | 9 | $125.00 | $75.00 to $125.00 | Bids- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 100.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 300.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 50.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 330.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 50.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 25.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 25.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $125.00 per LF · qty 330.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $75.00 per LF · qty 216.0 · bid tab
|
| excavation embankment | CY | 3 | $65.00 | $50.00 to $90.00 | Bids- 2026-05-27 · VDOT (Salem (2)) · C0000126851N01 · $90.00 per CY · qty 225.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $65.00 per CY · qty 865.0 · bid tab
- 2024-06-26 · VDOT (Salem (2)) · C0000122851N01 · $50.00 per CY · qty 225.0 · bid tab
|
| inlet headwall | EA | 3 | $10,500.00 | $10,500.00 to $12,400.00 | Bids- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $10,500.00 per EA · qty 1.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $12,400.00 per EA · qty 1.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $10,500.00 per EA · qty 1.0 · bid tab
|
| lime cement stabilization | TON | 3 | $300.00 | $299.65 to $1,000.00 | Bids- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $1,000.00 per TON · qty 1.0 · bid tab
- 2025-12-17 · VDOT (Salem (2)) · C0000119474C01 · $299.65 per TON · qty 0.4 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $300.00 per TON · qty 10.0 · bid tab
|
| manhole | EA | 3 | $3,000.00 | $2,997.95 to $4,628.15 | Bids- 2025-12-17 · VDOT (Salem (2)) · C0000119474C01 · $2,997.95 per EA · qty 6.0 · bid tab
- 2025-12-17 · VDOT (Salem (2)) · C0000119474C01 · $4,628.15 per EA · qty 1.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $3,000.00 per EA · qty 5.0 · bid tab
|
| sewer main (diameter not stated) | LF | 2 | $18.00 | $18.00 to $18.00 | Bids- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $18.00 per LF · qty 725.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $18.00 per LF · qty 725.0 · bid tab
|
| sidewalk | SY | 3 | $180.00 | $110.00 to $225.00 | Bids- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $180.00 per SY · qty 450.0 · bid tab
- 2026-03-25 · VDOT (Salem (2)) · C0000126858N01 · $225.00 per SY · qty 25.0 · bid tab
- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $110.00 per SY · qty 405.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $150.00 per LF · qty 46.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2024-12-11 · VDOT (Salem (2)) · C0000119562C01 · $150.00 per LF · qty 185.0 · bid tab
|