Site-work prices, Rockingham County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$161.00$127.00 to $400.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $161.00 per TON · qty 8081.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $127.00 per TON · qty 23330.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $148.00 per TON · qty 2385.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $127.00 per TON · qty 868.0 · bid tab
  • 2026-03-25 · VDOT (Staunton (8)) · C0000127819N01 · $143.25 per TON · qty 5337.0 · bid tab
  • 2026-03-25 · VDOT (Staunton (8)) · C0000127819N01 · $132.00 per TON · qty 2950.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $210.00 per TON · qty 67.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $400.00 per TON · qty 14.0 · bid tab
  • 2024-07-24 · VDOT (Staunton (8)) · C0000116857N01 · $300.00 per TON · qty 35.0 · bid tab
  • 2024-03-27 · VDOT (Staunton (8)) · C0000115719C01 · $190.00 per TON · qty 293.5 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterLF11$41.00$34.00 to $52.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $52.00 per LF · qty 810.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $35.00 per LF · qty 361.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $39.00 per LF · qty 346.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $52.00 per LF · qty 367.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $42.00 per LF · qty 500.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $42.00 per LF · qty 60.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $36.00 per LF · qty 100.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $39.00 per LF · qty 1050.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $34.00 per LF · qty 200.0 · bid tab
  • 2024-07-24 · VDOT (Staunton (8)) · C0000116857N01 · $41.00 per LF · qty 45.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
excavation embankmentCY3$37.00$37.00 to $65.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $37.00 per CY · qty 1568.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $37.00 per CY · qty 26970.0 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $65.00 per CY · qty 4065.0 · bid tab
excavation embankmentSY1$3.50$3.50 to $3.50
Bids
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $3.50 per SY · qty 750.0 · bid tab
fire hydrantEA1$4,782.00$4,782.00 to $4,782.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $4,782.00 per EA · qty 3.0 · bid tab
inlet headwallEA17$6,300.00$3,900.00 to $9,000.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $8,169.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $5,623.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $7,208.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $6,625.00 per EA · qty 7.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $5,396.00 per EA · qty 4.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $4,735.00 per EA · qty 3.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $5,381.00 per EA · qty 13.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $8,596.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $7,595.00 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $4,605.00 per EA · qty 6.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
lime cement stabilizationSY1$2.25$2.25 to $2.25
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $2.25 per SY · qty 56214.0 · bid tab
lime cement stabilizationTON4$305.00$250.00 to $500.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $300.00 per TON · qty 76.45 · bid tab
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $310.00 per TON · qty 13.15 · bid tab
  • 2024-07-24 · VDOT (Staunton (8)) · C0000116857N01 · $250.00 per TON · qty 1.1 · bid tab
  • 2024-03-27 · VDOT (Staunton (8)) · C0000115719C01 · $500.00 per TON · qty 0.99 · bid tab
manholeEA4$2,818.50$1,580.00 to $3,054.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $2,975.00 per EA · qty 2.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $1,580.00 per EA · qty 1.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $2,662.00 per EA · qty 6.0 · bid tab
  • 2024-07-24 · VDOT (Staunton (8)) · C0000116857N01 · $3,054.00 per EA · qty 2.0 · bid tab
sewer main 8-inchLF2$89.50$55.00 to $124.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $55.00 per LF · qty 1099.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $124.00 per LF · qty 538.0 · bid tab
sewer serviceLF1$54.00$54.00 to $54.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $54.00 per LF · qty 107.0 · bid tab
sidewalkSY2$82.62$65.25 to $100.00
Bids
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $65.25 per SY · qty 2900.0 · bid tab
  • 2024-07-24 · VDOT (Staunton (8)) · C0000116857N01 · $100.00 per SY · qty 534.0 · bid tab
storm pipe 15-inchLF1$89.00$89.00 to $89.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $89.00 per LF · qty 2971.0 · bid tab
storm pipe 18-inchLF1$102.00$102.00 to $102.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $102.00 per LF · qty 171.0 · bid tab
storm pipe 24-inchLF1$125.00$125.00 to $125.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $125.00 per LF · qty 851.0 · bid tab
storm pipe 30-inchLF1$171.00$171.00 to $171.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $171.00 per LF · qty 453.0 · bid tab
storm pipe (diameter not stated)LF1$3,200.00$3,200.00 to $3,200.00
Bids
  • 2026-02-25 · VDOT (Staunton (8)) · C0000115132M01 · $3,200.00 per LF · qty 15.0 · bid tab
water main 10-inchLF1$150.00$150.00 to $150.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $150.00 per LF · qty 935.0 · bid tab
water main 12-inchLF1$251.00$251.00 to $251.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $251.00 per LF · qty 72.0 · bid tab
water main 6-inchLF1$158.00$158.00 to $158.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $158.00 per LF · qty 137.0 · bid tab
water main 8-inchLF1$127.00$127.00 to $127.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $127.00 per LF · qty 717.0 · bid tab
water serviceLF2$243.50$96.00 to $391.00
Bids
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $96.00 per LF · qty 993.0 · bid tab
  • 2026-06-24 · VDOT (Staunton (8)) · C0000108810C01 · $391.00 per LF · qty 4.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.