| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 3 | $140.00 | $135.00 to $150.00 | Bids- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $140.00 per TON · qty 654.0 · bid tab
- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $150.00 per TON · qty 751.0 · bid tab
- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $135.00 per TON · qty 423.0 · bid tab
|
| curb gutter | LF | 18 | $45.00 | $5.00 to $70.00 | Bids- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $50.00 per LF · qty 300.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $60.00 per LF · qty 250.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $45.00 per LF · qty 1000.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $35.00 per LF · qty 100.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $45.00 per LF · qty 50.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $60.00 per LF · qty 100.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $50.00 per LF · qty 800.0 · bid tab
- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $35.00 per LF · qty 100.0 · bid tab
- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $70.00 per LF · qty 147.0 · bid tab
- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $65.00 per LF · qty 117.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed) |
| excavation embankment | CY | 2 | $72.50 | $20.00 to $125.00 | Bids- 2025-12-17 · VDOT (Richmond (4)) · C0000126242N01 · $20.00 per CY · qty 10.0 · bid tab
- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $125.00 per CY · qty 68.0 · bid tab
|
| inlet headwall | EA | 1 | $12,000.00 | $12,000.00 to $12,000.00 | Bids- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $12,000.00 per EA · qty 1.0 · bid tab
|
| lime cement stabilization | TON | 1 | $400.00 | $400.00 to $400.00 | Bids- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $400.00 per TON · qty 7.76 · bid tab
|
| manhole | EA | 4 | $3,274.55 | $2,277.88 to $5,241.99 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000128966N01 · $3,828.50 per EA · qty 6.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000128966N01 · $5,241.99 per EA · qty 1.0 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000126935N01 · $2,720.60 per EA · qty 4.0 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000126935N01 · $2,277.88 per EA · qty 15.0 · bid tab
|
| sidewalk | EA | 1 | $652.64 | $652.64 to $652.64 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000128966N01 · $652.64 per EA · qty 8.0 · bid tab
|
| sidewalk | SY | 2 | $72.50 | $60.00 to $85.00 | Bids- 2026-06-24 · VDOT (Richmond (4)) · C0000128731N01 · $85.00 per SY · qty 200.0 · bid tab
- 2024-03-27 · VDOT (Richmond (4)) · C0000123965N01 · $60.00 per SY · qty 200.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $250.00 per LF · qty 110.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $425.00 | $425.00 to $425.00 | Bids- 2025-11-19 · VDOT (Fredericksburg (6)) · C0000119111C01 · $425.00 per LF · qty 142.0 · bid tab
|