PadstakeGet the fee reports
Menu

Site-work prices, Pulaski County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$286.00$208.75 to $348.00
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $272.50 per TON · qty 685.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $208.75 per TON · qty 2953.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $274.00 per TON · qty 93.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $234.50 per TON · qty 920.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $262.71 per TON · qty 937.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $331.84 per TON · qty 578.0 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $336.00 per TON · qty 1056.0 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $342.00 per TON · qty 1202.0 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $348.00 per TON · qty 528.0 · bid tab
  • 2024-12-11 · VDOT (Salem (2)) · CM225PMN125724 · $286.00 per TON · qty 2239.76 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterLF10$60.25$28.00 to $92.38
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $28.00 per LF · qty 539.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $60.25 per LF · qty 856.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $60.25 per LF · qty 1623.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $29.75 per LF · qty 443.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $48.55 per LF · qty 489.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $92.38 per LF · qty 362.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $61.67 per LF · qty 136.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $67.69 per LF · qty 125.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $59.71 per LF · qty 145.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $88.26 per LF · qty 1423.0 · bid tab
excavation embankmentCY4$52.11$28.25 to $86.00
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $28.25 per CY · qty 7853.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $39.22 per CY · qty 1230.0 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $86.00 per CY · qty 3409.0 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $65.00 per CY · qty 6767.0 · bid tab
excavation embankmentSY3$3.55$2.07 to $8.18
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $3.55 per SY · qty 1832.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $2.07 per SY · qty 1110.0 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $8.18 per SY · qty 850.0 · bid tab
fire hydrantEA1$8,004.75$8,004.75 to $8,004.75
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $8,004.75 per EA · qty 1.0 · bid tab
inlet headwallEA13$7,712.25$5,807.05 to $11,000.00
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $7,712.25 per EA · qty 5.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $6,658.75 per EA · qty 8.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $7,307.75 per EA · qty 2.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $7,882.25 per EA · qty 1.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $8,714.25 per EA · qty 1.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $7,303.25 per EA · qty 2.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $8,810.69 per EA · qty 5.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $7,667.98 per EA · qty 4.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $5,807.05 per EA · qty 1.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $6,527.96 per EA · qty 4.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
lime cement stabilizationTON3$168.00$135.00 to $207.40
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $135.00 per TON · qty 14.31 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $207.40 per TON · qty 7.21 · bid tab
  • 2025-11-19 · VDOT (Salem (2)) · C0000119503C01 · $168.00 per TON · qty 19.0 · bid tab
manholeEA2$3,327.15$3,326.75 to $3,327.56
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $3,326.75 per EA · qty 8.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $3,327.56 per EA · qty 8.0 · bid tab
sidewalkSY1$132.08$132.08 to $132.08
Bids
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $132.08 per SY · qty 1216.0 · bid tab
storm pipe 15-inchLF1$133.25$133.25 to $133.25
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $133.25 per LF · qty 1224.0 · bid tab
storm pipe 36-inchLF1$385.75$385.75 to $385.75
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $385.75 per LF · qty 107.0 · bid tab
storm pipe 48-inchLF1$546.50$546.50 to $546.50
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $546.50 per LF · qty 67.0 · bid tab
storm pipe (diameter not stated)LF2$5,502.12$2,250.00 to $8,754.25
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $8,754.25 per LF · qty 104.0 · bid tab
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $2,250.00 per LF · qty 340.0 · bid tab
water main 12-inchLF1$266.50$266.50 to $266.50
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $266.50 per LF · qty 270.0 · bid tab
water main 2-inchLF1$44.12$44.12 to $44.12
Bids
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $44.12 per LF · qty 103.0 · bid tab
water main 4-inchLF1$141.24$141.24 to $141.24
Bids
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $141.24 per LF · qty 98.0 · bid tab
water main 6-inchLF2$375.89$209.25 to $542.54
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $209.25 per LF · qty 7.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $542.54 per LF · qty 11.0 · bid tab
water main (diameter not stated)LF1$475.75$475.75 to $475.75
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $475.75 per LF · qty 36.0 · bid tab
water serviceLF2$65.84$26.50 to $105.19
Bids
  • 2026-05-27 · VDOT (Salem (2)) · C0000119458C01 · $26.50 per LF · qty 70.0 · bid tab
  • 2026-02-04 · VDOT (Salem (2)) · C0000120758M01 · $105.19 per LF · qty 58.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.