| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 8 | $175.56 | $162.40 to $397.63 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $166.70 per TON · qty 1100.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $162.40 per TON · qty 730.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $165.05 per TON · qty 1330.0 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000115413C01B · $397.63 per TON · qty 185.0 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000115413C01B · $184.43 per TON · qty 647.0 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000115413C01B · $199.78 per TON · qty 904.0 · bid tab
- 2025-01-10 · VDOT (Richmond (4)) · CM425PM1125592 · $276.50 per TON · qty 4655.66 · bid tab
- 2024-02-28 · VDOT (Richmond (4)) · CM424PMD124126B · $163.45 per TON · qty 1594.88 · bid tab
|
| curb gutter | LF | 5 | $44.80 | $36.80 to $48.50 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $44.80 per LF · qty 262.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $48.50 per LF · qty 1189.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $36.80 per LF · qty 9.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $44.80 per LF · qty 264.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $48.50 per LF · qty 647.0 · bid tab
|
| excavation embankment | CY | 2 | $63.49 | $55.00 to $71.98 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $55.00 per CY · qty 10187.0 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000115413C01B · $71.98 per CY · qty 316.0 · bid tab
|
| fire hydrant | EA | 1 | $6,500.00 | $6,500.00 to $6,500.00 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $6,500.00 per EA · qty 1.0 · bid tab
|
| inlet headwall | EA | 5 | $7,760.00 | $5,840.00 to $8,680.00 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $5,840.00 per EA · qty 3.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $7,675.00 per EA · qty 15.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $8,035.00 per EA · qty 2.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $7,760.00 per EA · qty 1.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $8,680.00 per EA · qty 1.0 · bid tab
|
| lime cement stabilization | SY | 1 | $2.83 | $2.83 to $2.83 | Bids- 2025-07-23 · VDOT (Richmond (4)) · C0000115413C01B · $2.83 per SY · qty 4086.0 · bid tab
|
| lime cement stabilization | TON | 2 | $232.81 | $3.61 to $462.00 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $462.00 per TON · qty 9.1 · bid tab
- 2025-07-23 · VDOT (Richmond (4)) · C0000115413C01B · $3.61 per TON · qty 1.68 · bid tab
|
| manhole | EA | 1 | $2,048.00 | $2,048.00 to $2,048.00 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $2,048.00 per EA · qty 7.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $177.50 | $177.50 to $177.50 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $177.50 per LF · qty 565.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $140.00 | $140.00 to $140.00 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $140.00 per LF · qty 517.0 · bid tab
|
| water main 12-inch | LF | 1 | $327.10 | $327.10 to $327.10 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $327.10 per LF · qty 533.0 · bid tab
|
| water main 16-inch | LF | 1 | $330.70 | $330.70 to $330.70 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $330.70 per LF · qty 422.0 · bid tab
|
| water main 6-inch | LF | 1 | $149.40 | $149.40 to $149.40 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $149.40 per LF · qty 13.0 · bid tab
|
| water service | LF | 1 | $597.00 | $597.00 to $597.00 | Bids- 2026-07-22 · VDOT (Richmond (4)) · C0000111704C01 · $597.00 per LF · qty 24.0 · bid tab
|