Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON3$204.08$198.98 to $214.29
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $198.98 per TON · qty 1266.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $204.08 per TON · qty 1126.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $214.29 per TON · qty 2037.0 · bid tab
curb gutterLF6$55.16$53.15 to $55.16
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $55.16 per LF · qty 15.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $53.15 per LF · qty 722.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $55.16 per LF · qty 40.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $55.16 per LF · qty 560.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $53.17 per LF · qty 203.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $55.16 per LF · qty 1390.0 · bid tab
excavation embankmentCY1$45.00$45.00 to $45.00
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $45.00 per CY · qty 6774.0 · bid tab
fire hydrantEA1$12,071.51$12,071.51 to $12,071.51
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $12,071.51 per EA · qty 3.0 · bid tab
inlet headwallEA15$12,000.00$9,500.00 to $19,177.00
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $12,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $19,177.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $12,000.00 per EA · qty 2.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $15,000.00 per EA · qty 2.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $12,000.00 per EA · qty 2.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $12,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $14,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $12,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $13,000.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $19,000.00 per EA · qty 1.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed)
lime cement stabilizationTON2$544.00$450.00 to $638.00
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $450.00 per TON · qty 5.11 · bid tab
  • 2023-11-15 · VDOT (Lynchburg (3)) · C0000122725N01 · $638.00 per TON · qty 1.0 · bid tab
manholeEA3$3,323.80$2,712.27 to $3,625.16
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $3,625.16 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $2,712.27 per EA · qty 2.0 · bid tab
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $3,323.80 per EA · qty 21.0 · bid tab
sewer main 8-inchLF1$130.35$130.35 to $130.35
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $130.35 per LF · qty 482.0 · bid tab
sidewalkSY1$60.00$60.00 to $60.00
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $60.00 per SY · qty 1308.0 · bid tab
storm pipe 15-inchLF1$182.51$182.51 to $182.51
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $182.51 per LF · qty 386.0 · bid tab
storm pipe 18-inchLF1$137.01$137.01 to $137.01
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $137.01 per LF · qty 208.0 · bid tab
storm pipe 24-inchLF1$160.00$160.00 to $160.00
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $160.00 per LF · qty 644.0 · bid tab
water main 6-inchLF1$141.06$141.06 to $141.06
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $141.06 per LF · qty 63.0 · bid tab
water main 8-inchLF1$248.38$248.38 to $248.38
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $248.38 per LF · qty 1061.0 · bid tab
water serviceLF1$97.48$97.48 to $97.48
Bids
  • 2026-07-22 · VDOT (Lynchburg (3)) · C0000120710C01 · $97.48 per LF · qty 319.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.