Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$250.00$150.00 to $345.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $150.00 per TON · qty 2708.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $250.00 per TON · qty 100.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $250.00 per TON · qty 500.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $250.00 per TON · qty 100.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $345.00 per TON · qty 416.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $300.00 per TON · qty 622.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $345.00 per TON · qty 370.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $289.00 per TON · qty 94.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $160.00 per TON · qty 796.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $180.00 per TON · qty 3699.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterLF51$45.00$1.00 to $672.57
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $52.00 per LF · qty 160.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $52.00 per LF · qty 51.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $93.00 per LF · qty 190.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $52.00 per LF · qty 1000.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $49.00 per LF · qty 1000.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $49.00 per LF · qty 2000.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $45.00 per LF · qty 4000.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $42.00 per LF · qty 500.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $52.00 per LF · qty 500.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $42.00 per LF · qty 500.0 · bid tab
(10 most recent of 51 shown; all in the Hubstake feed)
excavation embankmentCY6$22.50$1.00 to $104.50
Bids
  • 2026-04-22 · VDOT (NOVa (9)) · C0000128578N01 · $25.00 per CY · qty 10.0 · bid tab
  • 2026-03-25 · VDOT (Hampton Roads (5)) · C0000128009N01 · $20.00 per CY · qty 25.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $53.00 per CY · qty 3588.0 · bid tab
  • 2024-12-11 · VDOT (NOVa (9)) · C0000125810N01 · $1.00 per CY · qty 200.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $104.50 per CY · qty 2198.0 · bid tab
  • 2024-01-17 · VDOT (NOVa (9)) · C00000124096N01 · $1.00 per CY · qty 100.0 · bid tab
fire hydrantEA1$12,000.00$12,000.00 to $12,000.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $12,000.00 per EA · qty 4.0 · bid tab
inlet headwallEA18$14,750.00$7,210.00 to $21,500.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $8,773.00 per EA · qty 4.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $7,530.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $7,210.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $9,467.00 per EA · qty 2.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $11,228.00 per EA · qty 1.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $11,676.00 per EA · qty 2.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $11,600.00 per EA · qty 1.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $15,000.00 per EA · qty 2.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $20,000.00 per EA · qty 1.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $21,500.00 per EA · qty 1.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed)
lime cement stabilizationSY1$6.50$6.50 to $6.50
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $6.50 per SY · qty 7218.0 · bid tab
lime cement stabilizationTON4$325.00$266.00 to $424.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $424.00 per TON · qty 36.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $350.00 per TON · qty 0.69 · bid tab
  • 2024-07-24 · VDOT (Hampton Roads (5)) · C0000123991C01 · $300.00 per TON · qty 0.75 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $266.00 per TON · qty 7.6 · bid tab
manholeEA19$2,995.00$1,952.82 to $7,500.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $3,251.00 per EA · qty 12.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $2,995.00 per EA · qty 10.0 · bid tab
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $3,828.00 per EA · qty 1.0 · bid tab
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $5,454.82 per EA · qty 3.0 · bid tab
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $1,952.82 per EA · qty 2.0 · bid tab
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $2,214.38 per EA · qty 15.0 · bid tab
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $2,475.94 per EA · qty 5.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $7,500.00 per EA · qty 1.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $5,000.00 per EA · qty 1.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $4,100.00 per EA · qty 3.0 · bid tab
(10 most recent of 19 shown; all in the Hubstake feed)
sewer main 15-inchLF1$600.00$600.00 to $600.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $600.00 per LF · qty 84.0 · bid tab
sidewalkEA6$500.00$410.97 to $750.00
Bids
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $410.97 per EA · qty 4.0 · bid tab
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $495.43 per EA · qty 4.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $750.00 per EA · qty 4.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · C0000124646N01 · $500.00 per EA · qty 5.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · C0000124646N01 · $500.00 per EA · qty 5.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · C0000124646N01 · $500.00 per EA · qty 5.0 · bid tab
sidewalkSY10$107.62$45.00 to $994.32
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $114.00 per SY · qty 34.0 · bid tab
  • 2025-09-24 · VDOT (Richmond (4)) · C0000126936N01B · $101.25 per SY · qty 4476.0 · bid tab
  • 2025-07-23 · VDOT (Salem (2)) · C0000126286N01 · $994.32 per SY · qty 38.0 · bid tab
  • 2024-12-11 · VDOT (NOVa (9)) · C0000125810N01 · $45.00 per SY · qty 1800.0 · bid tab
  • 2024-09-25 · VDOT (Salem (2)) · C0000122864C01 · $350.00 per SY · qty 68.0 · bid tab
  • 2024-07-24 · VDOT (Hampton Roads (5)) · C0000123991C01 · $90.00 per SY · qty 37.0 · bid tab
  • 2024-07-24 · VDOT (Hampton Roads (5)) · C0000123991C01 · $117.00 per SY · qty 893.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $61.00 per SY · qty 2330.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · C0000124646N01 · $150.00 per SY · qty 100.0 · bid tab
  • 2024-01-17 · VDOT (NOVa (9)) · C00000124096N01 · $50.00 per SY · qty 1680.0 · bid tab
storm pipe 15-inchLF1$125.00$125.00 to $125.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $125.00 per LF · qty 277.0 · bid tab
storm pipe 18-inchLF1$141.00$141.00 to $141.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $141.00 per LF · qty 323.0 · bid tab
storm pipe 24-inchLF1$187.00$187.00 to $187.00
Bids
  • 2025-09-24 · VDOT (Hampton Roads (5)) · C0000059175C01 · $187.00 per LF · qty 181.0 · bid tab
water main 10-inchLF1$1,000.00$1,000.00 to $1,000.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $1,000.00 per LF · qty 51.0 · bid tab
water main 12-inchLF1$650.00$650.00 to $650.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $650.00 per LF · qty 3338.0 · bid tab
water main 16-inchLF1$660.00$660.00 to $660.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $660.00 per LF · qty 363.0 · bid tab
water main 6-inchLF1$1,000.00$1,000.00 to $1,000.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $1,000.00 per LF · qty 266.0 · bid tab
water main 8-inchLF1$675.00$675.00 to $675.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $675.00 per LF · qty 722.0 · bid tab
water serviceLF2$295.00$235.00 to $355.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $235.00 per LF · qty 537.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C000015955C01C · $355.00 per LF · qty 14.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.