Site-work prices, Orange County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON3$190.00$138.00 to $192.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $138.00 per TON · qty 2289.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $190.00 per TON · qty 524.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $192.00 per TON · qty 722.0 · bid tab
curb gutterEA1$370.00$370.00 to $370.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $370.00 per EA · qty 4.0 · bid tab
curb gutterLF6$36.00$34.00 to $45.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $45.00 per LF · qty 1032.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $45.00 per LF · qty 761.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $34.00 per LF · qty 370.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $36.00 per LF · qty 202.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $36.00 per LF · qty 101.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $34.00 per LF · qty 191.0 · bid tab
excavation embankmentCY1$6.00$6.00 to $6.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $6.00 per CY · qty 55.0 · bid tab
inlet headwallEA10$7,575.00$5,400.00 to $12,000.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $8,475.00 per EA · qty 4.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $7,750.00 per EA · qty 2.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $5,500.00 per EA · qty 4.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $6,800.00 per EA · qty 2.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $12,000.00 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $9,000.00 per EA · qty 3.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $5,400.00 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $7,400.00 per EA · qty 3.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $11,400.00 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $6,450.00 per EA · qty 1.0 · bid tab
lime cement stabilizationSY1$2.00$2.00 to $2.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $2.00 per SY · qty 360.0 · bid tab
lime cement stabilizationTON1$350.00$350.00 to $350.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $350.00 per TON · qty 23.0 · bid tab
manholeEA1$2,460.00$2,460.00 to $2,460.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $2,460.00 per EA · qty 4.0 · bid tab
sidewalkSY2$71.50$58.00 to $85.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $85.00 per SY · qty 6.0 · bid tab
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $58.00 per SY · qty 744.0 · bid tab
storm pipe 36-inchLF1$650.00$650.00 to $650.00
Bids
  • 2024-10-23 · VDOT (Culpeper (7)) · C0000115475C01 · $650.00 per LF · qty 128.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.