Site-work prices, New Kent County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON5$198.00$178.00 to $213.00
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $198.00 per TON · qty 176.0 · bid tab
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $213.00 per TON · qty 117.0 · bid tab
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $178.00 per TON · qty 464.0 · bid tab
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $180.00 per TON · qty 414.0 · bid tab
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $203.50 per TON · qty 217.0 · bid tab
curb gutterLF1$42.50$42.50 to $42.50
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $42.50 per LF · qty 310.0 · bid tab
excavation embankmentCY1$25.00$25.00 to $25.00
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $25.00 per CY · qty 4489.0 · bid tab
inlet headwallEA1$8,260.00$8,260.00 to $8,260.00
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $8,260.00 per EA · qty 1.0 · bid tab
lime cement stabilizationTON1$518.00$518.00 to $518.00
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $518.00 per TON · qty 7.0 · bid tab
manholeEA1$1,948.00$1,948.00 to $1,948.00
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $1,948.00 per EA · qty 8.0 · bid tab
sidewalkSY1$78.40$78.40 to $78.40
Bids
  • 2024-12-11 · VDOT (Richmond (4)) · C0000120444C01 · $78.40 per SY · qty 389.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.