Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON12$222.50$92.00 to $370.00
Bids
  • 2025-10-22 · VDOT (NOVa (9)) · C0000127769N01 · $99.00 per TON · qty 1668.0 · bid tab
  • 2025-10-22 · VDOT (NOVa (9)) · C0000127769N01 · $92.00 per TON · qty 3335.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $306.00 per TON · qty 158.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $180.00 per TON · qty 621.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $306.00 per TON · qty 40.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000118817B08B · $370.00 per TON · qty 94.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000118817B08B · $265.00 per TON · qty 79.0 · bid tab
  • 2025-02-26 · VDOT (NOVa (9)) · C0000114103C01 · $118.00 per TON · qty 1119.0 · bid tab
  • 2025-02-26 · VDOT (NOVa (9)) · C0000114103C01 · $96.00 per TON · qty 862.0 · bid tab
  • 2025-02-26 · VDOT (NOVa (9)) · C0000114103C01 · $107.00 per TON · qty 240.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
curb gutterLF14$50.19$33.46 to $100.00
Bids
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $42.50 per LF · qty 308.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $56.20 per LF · qty 149.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $55.20 per LF · qty 104.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $42.50 per LF · qty 64.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $55.20 per LF · qty 18.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $56.20 per LF · qty 920.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000118817B08B · $70.00 per LF · qty 56.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $50.19 per LF · qty 323.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $45.73 per LF · qty 3.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $45.73 per LF · qty 2117.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
excavation embankmentCY3$62.00$5.00 to $119.90
Bids
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $119.90 per CY · qty 71.0 · bid tab
  • 2025-02-26 · VDOT (NOVa (9)) · C0000114103C01 · $62.00 per CY · qty 1984.0 · bid tab
  • 2024-04-24 · VDOT (NOVa (9)) · C00000124732N01 · $5.00 per CY · qty 75.0 · bid tab
inlet headwallEA10$10,700.42$5,799.85 to $21,279.34
Bids
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $13,744.10 per EA · qty 4.0 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $12,954.70 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $21,279.34 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $10,848.18 per EA · qty 2.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $10,552.66 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $7,144.81 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $10,148.63 per EA · qty 2.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $12,507.38 per EA · qty 1.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $5,799.85 per EA · qty 2.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $10,427.29 per EA · qty 3.0 · bid tab
lime cement stabilizationSY3$5.00$1.00 to $5.00
Bids
  • 2025-10-22 · VDOT (NOVa (9)) · C0000127769N01 · $5.00 per SY · qty 360.0 · bid tab
  • 2025-02-26 · VDOT (NOVa (9)) · C0000114103C01 · $5.00 per SY · qty 458.0 · bid tab
  • 2023-11-15 · VDOT (NOVa (9)) · C0000123645N01 · $1.00 per SY · qty 1066.0 · bid tab
lime cement stabilizationTON4$475.00$289.99 to $23,500.00
Bids
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $600.00 per TON · qty 1.62 · bid tab
  • 2025-05-28 · VDOT (NOVa (9)) · C0000118817B08B · $23,500.00 per TON · qty 0.2 · bid tab
  • 2025-02-26 · VDOT (NOVa (9)) · C0000114103C01 · $350.00 per TON · qty 5.49 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $289.99 per TON · qty 8.0 · bid tab
manholeEA2$2,210.17$1,840.34 to $2,580.00
Bids
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $2,580.00 per EA · qty 2.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $1,840.34 per EA · qty 1.0 · bid tab
sidewalkSY2$80.17$53.54 to $106.80
Bids
  • 2025-05-28 · VDOT (NOVa (9)) · C0000068760C01 · $106.80 per SY · qty 474.0 · bid tab
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $53.54 per SY · qty 241.0 · bid tab
storm pipe 15-inchLF1$194.93$194.93 to $194.93
Bids
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $194.93 per LF · qty 382.0 · bid tab
storm pipe 24-inchLF1$267.48$267.48 to $267.48
Bids
  • 2024-10-23 · VDOT (NOVa (9)) · C0000121172C01 · $267.48 per LF · qty 24.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.