PadstakeGet the fee reports
Menu

Site-work prices, Henrico County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$714.00$618.80 to $925.00
Bids
  • 2026-06-24 · VDOT (Richmond (4)) · C0000121544B01 · $761.61 per TON · qty 18.0 · bid tab
  • 2026-06-24 · VDOT (Richmond (4)) · C0000121544B01 · $666.40 per TON · qty 13.0 · bid tab
  • 2026-06-24 · VDOT (Richmond (4)) · C0000121544B01 · $618.80 per TON · qty 57.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $925.00 per TON · qty 14.4 · bid tab
curb gutterLF7$120.00$109.76 to $125.00
Bids
  • 2026-06-24 · VDOT (Richmond (4)) · C0000121544B01 · $109.76 per LF · qty 86.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $115.00 per LF · qty 333.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $125.00 per LF · qty 4.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $125.00 per LF · qty 60.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $120.00 per LF · qty 40.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $115.00 per LF · qty 307.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $120.00 per LF · qty 254.0 · bid tab
excavation embankmentCY1$114.24$114.24 to $114.24
Bids
  • 2026-06-24 · VDOT (Richmond (4)) · C0000121544B01 · $114.24 per CY · qty 10.0 · bid tab
lime cement stabilizationTON1$1,904.01$1,904.01 to $1,904.01
Bids
  • 2026-06-24 · VDOT (Richmond (4)) · C0000121544B01 · $1,904.01 per TON · qty 0.28 · bid tab
manholeEA9$3,442.00$1,604.00 to $4,536.20
Bids
  • 2025-02-26 · VDOT (Richmond (4)) · C0000120484M01 · $1,604.00 per EA · qty 6.0 · bid tab
  • 2025-02-26 · VDOT (Richmond (4)) · C0000120484M01 · $3,712.00 per EA · qty 20.0 · bid tab
  • 2025-02-26 · VDOT (Richmond (4)) · C0000120484M01 · $3,442.00 per EA · qty 20.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $2,100.00 per EA · qty 19.0 · bid tab
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $2,650.00 per EA · qty 6.0 · bid tab
  • 2024-05-22 · VDOT (Richmond (4)) · C0000119760M01 · $3,758.96 per EA · qty 4.0 · bid tab
  • 2024-05-22 · VDOT (Richmond (4)) · C0000119760M01 · $4,536.20 per EA · qty 2.0 · bid tab
  • 2024-05-22 · VDOT (Richmond (4)) · C0000119760M01 · $3,019.03 per EA · qty 101.0 · bid tab
  • 2024-05-22 · VDOT (Richmond (4)) · C0000119760M01 · $3,537.24 per EA · qty 22.0 · bid tab
sidewalkSY1$275.00$275.00 to $275.00
Bids
  • 2024-07-24 · VDOT (Richmond (4)) · C0000107038T09 · $275.00 per SY · qty 173.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.