Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON6$208.00$162.00 to $355.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $266.00 per TON · qty 9416.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $162.00 per TON · qty 8655.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $162.00 per TON · qty 5488.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $355.00 per TON · qty 81.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $194.00 per TON · qty 11928.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $222.00 per TON · qty 93858.0 · bid tab
curb gutterLF6$33.00$30.00 to $45.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $36.00 per LF · qty 1229.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $45.00 per LF · qty 561.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $36.00 per LF · qty 1919.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $30.00 per LF · qty 610.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $30.00 per LF · qty 737.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $30.00 per LF · qty 216.0 · bid tab
curb gutterTON1$770.00$770.00 to $770.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $770.00 per TON · qty 24.0 · bid tab
excavation embankmentCY1$20.00$20.00 to $20.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $20.00 per CY · qty 54359.0 · bid tab
inlet headwallEA17$10,000.00$1,500.00 to $18,000.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 2.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $12,000.00 per EA · qty 4.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $7,500.00 per EA · qty 2.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 4.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 4.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $5,000.00 per EA · qty 17.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 1.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $10,000.00 per EA · qty 88.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $15,000.00 per EA · qty 1.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
lime cement stabilizationSY1$3.00$3.00 to $3.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $3.00 per SY · qty 18822.0 · bid tab
lime cement stabilizationTON1$120.00$120.00 to $120.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $120.00 per TON · qty 173.0 · bid tab
manholeEA2$4,545.00$3,720.00 to $5,370.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $3,720.00 per EA · qty 14.0 · bid tab
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $5,370.00 per EA · qty 2.0 · bid tab
sewer main 16-inchLF1$425.00$425.00 to $425.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $425.00 per LF · qty 292.0 · bid tab
sewer main 20-inchLF1$490.00$490.00 to $490.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $490.00 per LF · qty 376.0 · bid tab
sewer main 8-inchLF1$230.00$230.00 to $230.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $230.00 per LF · qty 334.0 · bid tab
sewer serviceLF1$130.00$130.00 to $130.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $130.00 per LF · qty 37.0 · bid tab
sidewalkSY1$61.50$61.50 to $61.50
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $61.50 per SY · qty 1210.0 · bid tab
storm pipe 15-inchLF1$150.00$150.00 to $150.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $150.00 per LF · qty 9539.0 · bid tab
storm pipe 18-inchLF1$180.00$180.00 to $180.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $180.00 per LF · qty 13499.0 · bid tab
storm pipe 21-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $200.00 per LF · qty 495.0 · bid tab
storm pipe 24-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $200.00 per LF · qty 2894.0 · bid tab
storm pipe 30-inchLF1$185.00$185.00 to $185.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $185.00 per LF · qty 861.0 · bid tab
storm pipe 36-inchLF1$400.00$400.00 to $400.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $400.00 per LF · qty 12.0 · bid tab
water main 12-inchLF1$315.00$315.00 to $315.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $315.00 per LF · qty 985.0 · bid tab
water main 6-inchLF1$530.00$530.00 to $530.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $530.00 per LF · qty 8.0 · bid tab
water serviceLF1$135.00$135.00 to $135.00
Bids
  • 2025-12-17 · VDOT (Staunton (8)) · C0000116280C01 · $135.00 per LF · qty 185.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.