| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 3 | $236.25 | $220.50 to $299.25 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $220.50 per TON · qty 3411.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $299.25 per TON · qty 118.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $236.25 per TON · qty 5314.0 · bid tab
|
| curb gutter | LF | 2 | $32.00 | $31.50 to $32.51 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $31.50 per LF · qty 110.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $32.51 per LF · qty 3410.0 · bid tab
|
| curb gutter | TON | 1 | $404.14 | $404.14 to $404.14 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $404.14 per TON · qty 141.0 · bid tab
|
| excavation embankment | CY | 1 | $77.30 | $77.30 to $77.30 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $77.30 per CY · qty 427.0 · bid tab
|
| inlet headwall | EA | 5 | $30,824.54 | $14,830.39 to $33,097.64 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $16,383.20 per EA · qty 2.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $31,980.25 per EA · qty 5.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $14,830.39 per EA · qty 2.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $33,097.64 per EA · qty 1.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $30,824.54 per EA · qty 7.0 · bid tab
|
| lime cement stabilization | TON | 2 | $356.40 | $307.67 to $405.13 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $307.67 per TON · qty 14.41 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000122147C01C · $405.13 per TON · qty 12.38 · bid tab
|
| manhole | EA | 5 | $3,146.92 | $2,361.17 to $7,877.10 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $2,866.45 per EA · qty 2.0 · bid tab
- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $2,361.17 per EA · qty 2.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000122147C01C · $7,877.10 per EA · qty 18.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000122147C01C · $3,146.92 per EA · qty 94.0 · bid tab
- 2026-07-22 · VDOT (Richmond (4)) · C0000122147C01C · $5,002.89 per EA · qty 24.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $523.00 | $523.00 to $523.00 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $523.00 per LF · qty 1239.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $615.26 | $615.26 to $615.26 | Bids- 2026-08-26 · VDOT (Richmond (4)) · C0000129131C01B · $615.26 per LF · qty 453.0 · bid tab
|