| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 8 | $272.00 | $111.00 to $357.50 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $319.00 per TON · qty 321.3 · bid tab
- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $357.50 per TON · qty 408.0 · bid tab
- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $324.50 per TON · qty 844.7 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $227.00 per TON · qty 892.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $241.00 per TON · qty 830.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $303.00 per TON · qty 306.0 · bid tab
- 2026-02-04 · VDOT (Salem (2)) · CM226PMH127370 · $160.00 per TON · qty 1132.03 · bid tab
- 2025-01-10 · VDOT (Salem (2)) · CM225PMH125706 · $111.00 per TON · qty 608.26 · bid tab
|
| curb gutter | LF | 1 | $71.50 | $71.50 to $71.50 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $71.50 per LF · qty 353.0 · bid tab
|
| curb gutter | TON | 1 | $1,155.00 | $1,155.00 to $1,155.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $1,155.00 per TON · qty 14.6 · bid tab
|
| excavation embankment | CY | 2 | $33.38 | $16.75 to $50.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $50.00 per CY · qty 2598.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $16.75 per CY · qty 1276.0 · bid tab
|
| excavation embankment | SY | 1 | $8.00 | $8.00 to $8.00 | Bids- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $8.00 per SY · qty 204.2 · bid tab
|
| fire hydrant | EA | 1 | $10,000.00 | $10,000.00 to $10,000.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $10,000.00 per EA · qty 1.0 · bid tab
|
| inlet headwall | EA | 7 | $8,302.00 | $6,563.00 to $15,000.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $15,000.00 per EA · qty 2.0 · bid tab
- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $15,000.00 per EA · qty 1.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $8,215.00 per EA · qty 1.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $8,225.00 per EA · qty 9.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $8,302.00 per EA · qty 6.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $10,268.00 per EA · qty 1.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $6,563.00 per EA · qty 1.0 · bid tab
|
| lime cement stabilization | SY | 1 | $5.00 | $5.00 to $5.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $5.00 per SY · qty 1091.0 · bid tab
|
| lime cement stabilization | TON | 2 | $663.50 | $132.00 to $1,195.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $132.00 per TON · qty 7.7 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $1,195.00 per TON · qty 3.5 · bid tab
|
| storm pipe 15-inch | LF | 1 | $200.00 | $200.00 to $200.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $200.00 per LF · qty 102.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $161.00 | $161.00 to $161.00 | Bids- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $161.00 per LF · qty 656.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $267.00 | $234.00 to $300.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $300.00 per LF · qty 11.0 · bid tab
- 2026-05-27 · VDOT (Salem (2)) · C0000115456C01 · $234.00 per LF · qty 53.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $660.00 | $660.00 to $660.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $660.00 per LF · qty 378.0 · bid tab
|
| water main 6-inch | LF | 1 | $300.00 | $300.00 to $300.00 | Bids- 2026-06-24 · VDOT (Salem (2)) · C0000119467C01 · $300.00 per LF · qty 10.0 · bid tab
|