| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 4 | $161.09 | $152.79 to $167.77 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $167.77 per TON · qty 1379.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $162.94 per TON · qty 765.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $159.24 per TON · qty 1624.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $152.79 per TON · qty 2221.0 · bid tab
|
| curb gutter | LF | 7 | $32.34 | $32.34 to $42.64 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $32.34 per LF · qty 110.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $32.34 per LF · qty 401.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $32.34 per LF · qty 52.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $37.55 per LF · qty 1445.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $42.64 per LF · qty 657.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $32.34 per LF · qty 275.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $37.55 per LF · qty 1232.0 · bid tab
|
| curb gutter | TON | 1 | $923.86 | $923.86 to $923.86 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $923.86 per TON · qty 14.0 · bid tab
|
| excavation embankment | CY | 1 | $60.00 | $60.00 to $60.00 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $60.00 per CY · qty 21176.0 · bid tab
|
| excavation embankment | SY | 1 | $6.04 | $6.04 to $6.04 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $6.04 per SY · qty 865.0 · bid tab
|
| inlet headwall | EA | 13 | $10,698.11 | $9,054.38 to $15,100.00 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $10,698.11 per EA · qty 2.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $9,570.98 per EA · qty 5.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $12,807.26 per EA · qty 1.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $11,288.46 per EA · qty 6.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $10,435.41 per EA · qty 6.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $9,571.62 per EA · qty 3.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $9,054.38 per EA · qty 1.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $11,579.08 per EA · qty 1.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $15,100.00 per EA · qty 1.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $10,129.66 per EA · qty 1.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| lime cement stabilization | SY | 1 | $5.51 | $5.51 to $5.51 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $5.51 per SY · qty 6200.0 · bid tab
|
| lime cement stabilization | TON | 1 | $320.00 | $320.00 to $320.00 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $320.00 per TON · qty 31.25 · bid tab
|
| manhole | EA | 2 | $13,563.66 | $4,386.74 to $22,740.58 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $4,386.74 per EA · qty 10.0 · bid tab
- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $22,740.58 per EA · qty 1.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $94.89 | $94.89 to $94.89 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $94.89 per LF · qty 2266.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $109.81 | $109.81 to $109.81 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $109.81 per LF · qty 547.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $148.73 | $148.73 to $148.73 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $148.73 per LF · qty 331.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $225.00 | $225.00 to $225.00 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $225.00 per LF · qty 47.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $700.00 | $700.00 to $700.00 | Bids- 2026-04-22 · VDOT (Culpeper (7)) · C0000118863C01 · $700.00 per LF · qty 17.0 · bid tab
|