Site-work prices, Fauquier County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON13$160.00$105.00 to $227.30
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $105.00 per TON · qty 64.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $125.00 per TON · qty 3408.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $106.00 per TON · qty 5498.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $130.00 per TON · qty 5127.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $161.00 per TON · qty 123.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $213.40 per TON · qty 833.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $217.00 per TON · qty 485.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $227.30 per TON · qty 316.0 · bid tab
  • 2026-02-25 · VDOT (Culpeper (7)) · C0000125982C01 · $200.00 per TON · qty 462.0 · bid tab
  • 2026-02-25 · VDOT (Culpeper (7)) · C0000125982C01 · $155.00 per TON · qty 1065.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
curb gutterLF18$50.00$40.00 to $81.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $48.00 per LF · qty 135.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $53.00 per LF · qty 848.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $48.00 per LF · qty 559.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $48.00 per LF · qty 205.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $53.00 per LF · qty 614.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $81.00 per LF · qty 230.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $48.00 per LF · qty 132.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $55.00 per LF · qty 165.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $59.30 per LF · qty 254.0 · bid tab
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $50.00 per LF · qty 222.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed)
curb gutterTON1$188.00$188.00 to $188.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $188.00 per TON · qty 187.0 · bid tab
excavation embankmentCY4$66.80$65.00 to $80.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $68.00 per CY · qty 17114.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $65.60 per CY · qty 837.0 · bid tab
  • 2026-02-25 · VDOT (Culpeper (7)) · C0000125982C01 · $65.00 per CY · qty 1660.0 · bid tab
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $80.00 per CY · qty 2219.0 · bid tab
fire hydrantEA1$3,000.00$3,000.00 to $3,000.00
Bids
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $3,000.00 per EA · qty 11.0 · bid tab
inlet headwallEA32$15,000.00$5,946.00 to $45,000.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $10,700.00 per EA · qty 2.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $9,450.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $8,050.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $8,400.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $8,500.00 per EA · qty 3.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $9,350.00 per EA · qty 1.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $6,800.00 per EA · qty 3.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $8,350.00 per EA · qty 5.0 · bid tab
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $9,500.00 per EA · qty 1.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $6,569.00 per EA · qty 4.0 · bid tab
(10 most recent of 32 shown; all in the Hubstake feed)
lime cement stabilizationSY1$5.00$5.00 to $5.00
Bids
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $5.00 per SY · qty 3870.0 · bid tab
lime cement stabilizationTON4$575.00$302.00 to $760.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $302.00 per TON · qty 47.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $760.00 per TON · qty 2.11 · bid tab
  • 2026-02-25 · VDOT (Culpeper (7)) · C0000125982C01 · $650.00 per TON · qty 6.0 · bid tab
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $500.00 per TON · qty 9.1 · bid tab
manholeEA5$2,750.00$2,033.00 to $12,000.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $2,033.00 per EA · qty 7.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $2,995.00 per EA · qty 3.0 · bid tab
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $12,000.00 per EA · qty 1.0 · bid tab
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $2,200.00 per EA · qty 27.0 · bid tab
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $2,750.00 per EA · qty 7.0 · bid tab
sidewalkSY1$75.00$75.00 to $75.00
Bids
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $75.00 per SY · qty 3835.0 · bid tab
storm pipe 15-inchLF2$167.00$148.00 to $186.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $186.00 per LF · qty 1208.0 · bid tab
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $148.00 per LF · qty 125.0 · bid tab
storm pipe 18-inchLF1$302.00$302.00 to $302.00
Bids
  • 2026-05-27 · VDOT (Culpeper (7)) · C0000119206C01 · $302.00 per LF · qty 340.0 · bid tab
storm pipe 24-inchLF1$340.00$340.00 to $340.00
Bids
  • 2026-07-22 · VDOT (Culpeper (7)) · C0000120748C01 · $340.00 per LF · qty 123.0 · bid tab
water main 12-inchLF1$500.00$500.00 to $500.00
Bids
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $500.00 per LF · qty 162.0 · bid tab
water main 6-inchLF1$290.00$290.00 to $290.00
Bids
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $290.00 per LF · qty 203.0 · bid tab
water main 8-inchLF1$395.00$395.00 to $395.00
Bids
  • 2024-02-28 · VDOT (Culpeper (7)) · C000111648C01B · $395.00 per LF · qty 2110.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.