Site-work prices, Emporia County, VA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
curb gutterLF4$70.00$70.00 to $100.00
Bids
  • 2025-01-22 · VDOT (Hampton Roads (5)) · CM525PM1125498 · $100.00 per LF · qty 180.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $70.00 per LF · qty 58.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $70.00 per LF · qty 18.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $70.00 per LF · qty 7.0 · bid tab
lime cement stabilizationTON1$400.00$400.00 to $400.00
Bids
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $400.00 per TON · qty 0.25 · bid tab
sidewalkSY2$47.50$20.00 to $75.00
Bids
  • 2025-01-22 · VDOT (Hampton Roads (5)) · CM525PM1125498 · $20.00 per SY · qty 155.0 · bid tab
  • 2024-06-26 · VDOT (Hampton Roads (5)) · CM525PMT123387 · $75.00 per SY · qty 51.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.