| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | SY | 1 | $310.00 | $310.00 to $310.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $310.00 per SY · qty 346.0 · bid tab
|
| asphalt pavement | TON | 4 | $263.00 | $242.00 to $300.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $272.00 per TON · qty 369.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $242.00 per TON · qty 265.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $254.00 per TON · qty 249.0 · bid tab
- 2025-12-17 · VDOT (Richmond (4)) · CM426PMD127953 · $300.00 per TON · qty 342.0 · bid tab
|
| curb gutter | LF | 4 | $92.50 | $89.00 to $98.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $94.00 per LF · qty 483.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $89.00 per LF · qty 197.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $91.00 per LF · qty 94.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $98.00 per LF · qty 356.0 · bid tab
|
| excavation embankment | CY | 2 | $88.50 | $50.00 to $127.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $50.00 per CY · qty 461.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $127.00 per CY · qty 52.0 · bid tab
|
| fire hydrant | EA | 1 | $14,550.00 | $14,550.00 to $14,550.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $14,550.00 per EA · qty 1.0 · bid tab
|
| inlet headwall | EA | 6 | $14,000.00 | $9,000.00 to $18,000.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $18,000.00 per EA · qty 1.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $10,000.00 per EA · qty 1.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $9,000.00 per EA · qty 2.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $13,000.00 per EA · qty 6.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $18,000.00 per EA · qty 5.0 · bid tab
- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $15,000.00 per EA · qty 1.0 · bid tab
|
| lime cement stabilization | SY | 1 | $4.00 | $4.00 to $4.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $4.00 per SY · qty 2702.0 · bid tab
|
| lime cement stabilization | TON | 1 | $594.00 | $594.00 to $594.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $594.00 per TON · qty 4.54 · bid tab
|
| manhole | EA | 5 | $6,250.00 | $2,676.10 to $7,222.31 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $6,250.00 per EA · qty 2.0 · bid tab
- 2025-10-22 · VDOT (Richmond (4)) · C0000120443M01 · $4,088.03 per EA · qty 41.0 · bid tab
- 2025-10-22 · VDOT (Richmond (4)) · C0000120443M01 · $2,676.10 per EA · qty 44.0 · bid tab
- 2025-10-22 · VDOT (Richmond (4)) · C0000120443M01 · $6,531.54 per EA · qty 6.0 · bid tab
- 2025-10-22 · VDOT (Richmond (4)) · C0000120443M01 · $7,222.31 per EA · qty 3.0 · bid tab
|
| sewer main 12-inch | LF | 1 | $744.00 | $744.00 to $744.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $744.00 per LF · qty 81.0 · bid tab
|
| sidewalk | SY | 1 | $105.00 | $105.00 to $105.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $105.00 per SY · qty 143.0 · bid tab
|
| water main 12-inch | LF | 1 | $1,021.00 | $1,021.00 to $1,021.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $1,021.00 per LF · qty 81.0 · bid tab
|
| water main 6-inch | LF | 1 | $409.00 | $409.00 to $409.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $409.00 per LF · qty 6.0 · bid tab
|
| water main 8-inch | LF | 1 | $436.00 | $436.00 to $436.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $436.00 per LF · qty 456.0 · bid tab
|
| water service | LF | 1 | $563.00 | $563.00 to $563.00 | Bids- 2026-02-04 · VDOT (Richmond (4)) · C000115407C01B · $563.00 per LF · qty 65.0 · bid tab
|