Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON3$185.00$165.00 to $195.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $165.00 per TON · qty 951.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $185.00 per TON · qty 286.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $195.00 per TON · qty 1051.0 · bid tab
curb gutterLF6$95.43$89.35 to $104.92
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $94.00 per LF · qty 365.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $103.53 per LF · qty 36.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $94.73 per LF · qty 178.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $96.12 per LF · qty 374.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $104.92 per LF · qty 810.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $89.35 per LF · qty 271.0 · bid tab
excavation embankmentCY2$38.62$36.00 to $41.25
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $41.25 per CY · qty 37.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $36.00 per CY · qty 672.0 · bid tab
fire hydrantEA1$8,000.00$8,000.00 to $8,000.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $8,000.00 per EA · qty 1.0 · bid tab
inlet headwallEA11$7,100.00$6,100.00 to $9,030.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $6,100.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,030.00 per EA · qty 5.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $9,030.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $8,600.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $6,800.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,800.00 per EA · qty 2.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,250.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,100.00 per EA · qty 1.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,700.00 per EA · qty 4.0 · bid tab
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $6,200.00 per EA · qty 1.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
lime cement stabilizationTON1$140.00$140.00 to $140.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $140.00 per TON · qty 11.0 · bid tab
manholeEA1$3,158.25$3,158.25 to $3,158.25
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $3,158.25 per EA · qty 6.0 · bid tab
water main 4-inchLF1$150.00$150.00 to $150.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $150.00 per LF · qty 35.0 · bid tab
water main 6-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $200.00 per LF · qty 6.0 · bid tab
water main 8-inchLF1$250.00$250.00 to $250.00
Bids
  • 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $250.00 per LF · qty 818.0 · bid tab