| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 3 | $185.00 | $165.00 to $195.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $165.00 per TON · qty 951.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $185.00 per TON · qty 286.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $195.00 per TON · qty 1051.0 · bid tab
|
| curb gutter | LF | 6 | $95.43 | $89.35 to $104.92 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $94.00 per LF · qty 365.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $103.53 per LF · qty 36.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $94.73 per LF · qty 178.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $96.12 per LF · qty 374.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $104.92 per LF · qty 810.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $89.35 per LF · qty 271.0 · bid tab
|
| excavation embankment | CY | 2 | $38.62 | $36.00 to $41.25 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $41.25 per CY · qty 37.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $36.00 per CY · qty 672.0 · bid tab
|
| fire hydrant | EA | 1 | $8,000.00 | $8,000.00 to $8,000.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $8,000.00 per EA · qty 1.0 · bid tab
|
| inlet headwall | EA | 11 | $7,100.00 | $6,100.00 to $9,030.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $6,100.00 per EA · qty 1.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,030.00 per EA · qty 5.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $9,030.00 per EA · qty 1.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $8,600.00 per EA · qty 1.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $6,800.00 per EA · qty 1.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,800.00 per EA · qty 2.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,250.00 per EA · qty 1.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,100.00 per EA · qty 1.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $7,700.00 per EA · qty 4.0 · bid tab
- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $6,200.00 per EA · qty 1.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed) |
| lime cement stabilization | TON | 1 | $140.00 | $140.00 to $140.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $140.00 per TON · qty 11.0 · bid tab
|
| manhole | EA | 1 | $3,158.25 | $3,158.25 to $3,158.25 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $3,158.25 per EA · qty 6.0 · bid tab
|
| water main 4-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $150.00 per LF · qty 35.0 · bid tab
|
| water main 6-inch | LF | 1 | $200.00 | $200.00 to $200.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $200.00 per LF · qty 6.0 · bid tab
|
| water main 8-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2025-09-24 · VDOT (Bristol (1)) · C0000119440C01 · $250.00 per LF · qty 818.0 · bid tab
|